My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt17 AECOM Technical Services, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2017
>
Agmt17 AECOM Technical Services, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2024 3:14:29 PM
Creation date
8/23/2017 1:00:27 PM
Metadata
Fields
Template:
Agreement
Contractor Name
AECOM Technical Services, Inc
PROJECT NAME
101/84 PS&E
RMP File Number
701
Date
8/21/2017
MO Ref
17-148 22-106 23-027
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Exhibit Table B (2)-2 <br />NOT TO EXCEED FEE SUMMARY <br />(2) Incorporate Cement Deep Soil Mix (CDSM) Design <br />DIRECT LABOR <br />DPM/Highway Design Manager <br />Sr. Project Engineer <br />Project Engineer <br />CAD <br />Geotechnical Manager <br />Geotechnical Engineer <br />Sr. Env Professional <br />Env Professional <br />Total Direct Labor <br />Labor Escalation (16 months assumed) <br />Total Direct Labor (escalated) <br />Overhead <br />Fee <br />Total Labor <br />SUBCONSULTANTS <br />Subtotal Subconsultants <br />Markup <br />Total Subconsultants <br />SUBCONTRACTED COSTS <br />Subtotal Expenses <br />Markup <br />Total Expenses <br />EXPENSES <br />Subtotal Expenses <br />Markup <br />Total Expenses <br />TOTAL PROJECT COST <br />Fours <br />Rate <br />Total <br />70 <br />103.73 <br />$7,261.10 <br />48 <br />82.00 <br />$3,936.00 <br />368 <br />58.53 <br />$21,523.04 <br />80 <br />53.38 <br />$4,270.40 <br />20 <br />89.07 <br />$1,781.40 <br />420 <br />65.37 <br />$27,455.40 <br />8 <br />86.47 <br />$691.76 <br />12 <br />69.19 <br />$830.28 <br />1,026 <br />$67,749.38 <br />1.200% <br />$812.99 <br />$68,562.37 <br />135.09% <br />$92,620.91 <br />10% <br />$16,118.33 <br />$177,301.61 <br />$0.00 <br />2% $0.00 <br />$0.00 <br />$0.00 <br />2% $0.00 <br />$0.00 <br />$0.00 <br />0% $0.00 <br />$0.00 <br />$177,302.00 <br />Note: Position rates are an anticipated average for each position category <br />Specific rates are determined by actual salary at time of service <br />Rate differences do not affect the total not to exceed contract amount. <br />ATN/AGR/2019/AMENDMENTS/AMEND NO. 2—AECOM 101/84 PS&E <br />REV: 07-03-19 DZ <br />Page 13 of 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.