My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2017-08-28 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2017
>
AgdaPkt 2017-08-28 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2017 9:41:44 AM
Creation date
8/24/2017 2:54:53 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
8/28/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
434
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REPORT <br />To the Honorable Mayor and City Council <br />From the City Manager <br /> <br />August 28, 2017 <br /> <br />SUBJECT <br />Amendment No. 1 to the Professional Services Agreement with Infrastructure <br />Engineering Corporation, Inc. for the California Potable Water Tank, Pump Station, and <br />Pipeline Project <br /> <br />RECOMMENDATION <br />By motion, approve and authorize the City Manager to execute Amendment No. 1 to the <br />Professional Services Agreement with Infrastructure Engineering Corporation, Inc. for <br />the final design and construction support of the California Potable Water Tank, Pump <br />Station, and Pipeline Project in the amount of $356,482 for a total amount of $741,821, <br />and to increase the contract amount up to an additional 10%, if necessary <br /> <br />BACKGROUND <br />On November 13, 2012, the City executed an agreement with Infrastructure Engineering <br />Corporation, Inc. (IEC) for the design of the California Potable Water Tank, Pump <br />Station, and Pipeline Project. <br /> <br />IEC prepared preliminary project plans and specifications, and provided technical <br />engineering analyses, detailed site assessments, and five alternative sites evaluations <br />in support of the preparation on the project Environmental Impact Report (EIR) which <br />was adopted by City Council on May 8, 2017. At that time, the City Council approved <br />the “Hillside Alternative” design for the project. <br />ANALYSIS <br />Staff is prepared to work with IEC and their sub-consultants to complete the project <br />design at the Hillside Alternative location rather than the original location (closer to <br />California Way). The revised scope of work for the alternative location will include <br />design restart; updates to plans and specifications to address changes in the project <br />design, engineering standards and new seismic and building codes; environmental <br />coordination, testing, and monitoring required by the EIR. <br /> <br />Staff have prepared a detailed amendment to the Design Professional Agreement <br />outlining preliminary work that can be applied to the new location; final design work; <br />additional geotechnical and slope stability analysis; retaining wall design reevaluation; <br />and new environmental testing and monitoring efforts. <br /> <br />6.1.F. - Page 1
The URL can be used to link to this page
Your browser does not support the video tag.