My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2017-09-11 Closed and Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2017
>
AgdaPkt 2017-09-11 Closed and Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2017 12:51:50 PM
Creation date
9/7/2017 6:06:39 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
9/11/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
530
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TA. - Page 51 <br /> LSA ASSOCIATES, INC. ROCKETSHIP REDWOOD CITY ELEMENTARY SCHOOL PROJECT <br /> SEPTEMBER 2016 INITIAL STUDY/MITIGATED NEGATIVE DECLARATION <br /> the latest Clean Air Plan that contains district-wide control measures to reduce ozone precursor <br /> emissions(i.e.,reactive organic gases [ROG] and nitrogen oxides [NOX]),particulate matter(PMIo <br /> and PM2.5),and greenhouse gas emissions. <br /> The current CAP,which was adopted on September 15,2010,by the BAAQMD Board of Directors: <br /> • Updates the Bay Area 2005 Ozone Strategy in accordance with the requirements of the <br /> California Clean Air Act to implement"all feasible measures"to reduce ozone; <br /> • Provides a control strategy to reduce ozone,particulate matter(PM),toxic air contaminants <br /> (TACs),and greenhouse gases in a single,integrated plan; <br /> • Reviews progress in improving air quality in recent years; and <br /> • Establishes emission control measures to be adopted or implemented in the 2010 to 2012 <br /> timeframe. <br /> Per the BAAQMD CEQA Guidelines,16 consistency with the Clean Air Plan can be determined if the <br /> project: 1) supports the goals of the Clean Air Plan; 2)includes applicable control measures from the <br /> Clean Air Plan; and 3)would not disrupt or hinder implementation of any control measures from the <br /> Clean Air Plan. An evaluation of the project's consistency with each of these criteria is provided <br /> below.As described below,the proposed project would not conflict with or obstruct implementation <br /> of the Clean Air Plan and this impact would be less than significant. <br /> Clean Air Plan Goals.The primary goals of the Clean Air Plan are to: attain air quality <br /> standards;reduce population exposure to air pollutants and protect public health in the Bay Area; and <br /> reduce greenhouse gas emissions and protect the climate. As indicated in the analysis that follows in <br /> Sections IILb and VILa,the proposed project would not exceed the BAAQMD's significance criteria <br /> for air pollutants or greenhouse gas emissions and would not increase exposure of the population to <br /> air pollutants. The proposed project would not hinder the region from attainment of the goals outlined <br /> in the Clean Air Plan. Therefore,the project supports the goals of the Clean Air Plan. <br /> Clean Air Plan Control Measures.The BAAQMD identifies control measures as part of the <br /> Clean Air Plan to reduce ozone precursor emissions from stationary,area,mobile,and transportation <br /> sources. The transportation control measures are designed to reduce emissions from motor vehicles <br /> by reducing vehicle trips and vehicle miles traveled(VMT)in addition to vehicle idling and traffic <br /> congestion. The proposed project would not conflict with the identified transportation and mobile <br /> source control measures of the Clean Air Plan as it would not substantially increase regional VMT. <br /> The proposed project would support the transportation control measures by providing incentive <br /> programs to encourage carpooling and the use of alternative modes of transportation. Bicycle racks <br /> with a capacity of up to 28 bikes would be located on the project site. <br /> The Clean Air Plan includes Land Use and Local Impacts Measures(LUMs)that aim to achieve the <br /> following: promote mixed-use,compact development to reduce motor vehicle travel and emissions <br /> and ensure that planned growth is focused in a way that protects people from exposure to air pollution <br /> from stationary and mobile sources of emissions. The LUMs identified by the BAAQMD are not <br /> 16 Bay Area Air Quality Management District,2011.Air Quality CEQA Guidelines.May. <br /> P:1RWC1401B Rocketship Sch-I\PRODUCrSUS-MND1Public\Ra ketship Public Review 09-29-16.docx(09/29/16)PUBLIC REVIEW DRAFT 27 <br /> ATTY/RESO.0084/CC RESO ADOPTING CEQA-ROCKETSHIP CHARTER SCHOOL APPEAL <br /> REV:09-05-17 VR Page 35 of 124 <br />
The URL can be used to link to this page
Your browser does not support the video tag.