Laserfiche WebLink
7.A. - Page 56 <br /> LSA ASSOCIATES, INC. ROCKETSHIP REDWOOD CITY ELEMENTARY SCHOOL PROJECT <br /> SEPTEMBER 2016 INITIAL STUDY/MITIGATED NEGATIVE DECLARATION <br /> threshold established by the BAAQMD,the proposed project would result in a cumulatively <br /> significant impact. In developing thresholds of significance for air pollutants,the BAAQMD <br /> considered the emission levels for which a project's individual emissions would be cumulatively <br /> considerable. According to the BAAQMD,if a project exceeds the identified significance thresholds, <br /> its emissions would be cumulatively considerable,resulting in significant adverse air quality impacts <br /> to the region's existing air quality conditions. The BAAQMD developed the CEQA Guidelines to <br /> assist lead agencies in evaluating air quality impacts of projects and plans proposed in the San <br /> Francisco Bay Area Air Basin. Projects have the potential to generate harmful air pollutants that <br /> degrade air quality and can expose sensitive populations to harmful pollutants. The thresholds are <br /> applicable to the project as it would require discretionary approval from the City. <br /> As shown in Table 2,implementation of the proposed project would generate less-than-significant <br /> regional emissions.As described in the project-specific air quality impacts discussion above,the <br /> proposed project would not result in individually significant impacts and therefore would not make a <br /> cumulatively considerable contribution to regional air quality impacts. <br /> d) Expose sensitive receptors to substantial pollutant concentrations?(Less-Than-Significant <br /> Impact) <br /> The project could expose sensitive receptors to substantial pollutant concentrations during project <br /> construction or during operation of the project. <br /> Construction Impacts.Residents and other sensitive receptors in the vicinity of the project site <br /> would be temporarily exposed to diesel engine exhaust during the construction period due to the <br /> operation of construction equipment.Health risks from TACs are a function of both concentration and <br /> duration of exposure. Construction diesel emissions are temporary,affecting an area for a period of <br /> days or perhaps weeks.Additionally,construction-related sources are mobile and transient in nature, <br /> and the emissions occur within the project site. The closest residential receptors are located <br /> approximately 400 feet south of the project site.Because of its short duration and the distance <br /> between the source and receptor locations,health risks from construction emissions of diesel <br /> particulate would be a less-than-significant impact. <br /> Operational Impacts.Future students of the project site could be exposed to increased levels <br /> of TACs from vehicle emissions on high volume roadways or from stationary sources in the project <br /> vicinity. <br /> High Volume Roadways. High volume roadways in the project vicinity could expose students <br /> on the project site to toxic air contaminants. The project site would be located approximately 750 east <br /> of State Route 84(SR-84)and approximately 1,300 feet south of US 101. According to the BAAQMD <br /> roadway screening tools,given the project site's proximity to SR-84,the contribution of PM2.5 concen- <br /> tration on the project site would be 0.005 µg/m3(micrograms per cubic meter)which is below the <br /> BAAQMD's threshold of 0.30 gg/m3.The estimated cancer risk associated with exposure to this <br /> roadway is 0.528 in 1 million,which is below the BAAQMD's threshold of 10 in 1 million. The <br /> contribution of PM2_5 concentration on the project site attributable to US 101 would be 0.027 gg/m3, <br /> which is below the BAAQMD's threshold of 0.30 µg/m3.The estimated cancer risk associated with <br /> exposure to this roadway is 3.11 in 1 million,which is below the BAAQMD's threshold of 10 in 1 <br /> million. Therefore,potential toxic air contaminant impacts from high volume roadways would not be <br /> significant. <br /> P:1RWC1401B Rocketship Sch-I\PRODUCrSUS-MND1Public\Ra ketship Public Review 09-29-16.docx(09/29/16)PUBLIC REVIEW DRAFT 32 <br /> ATTY/RESO.0084/CC RESO ADOPTING CEQA-ROCKETSHIP CHARTER SCHOOL APPEAL <br /> REV:09-05-17 VR Page 40 of 124 <br />