My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2017-09-11 Closed and Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2017
>
AgdaPkt 2017-09-11 Closed and Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2017 12:51:50 PM
Creation date
9/7/2017 6:06:39 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
9/11/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
530
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.A. - Page 102 <br /> LSA ASSOCIATES, INC. ROCKETSHIP REDWOOD CITY ELEMENTARY SCHOOL PROJECT <br /> SEPTEMBER 2016 INITIAL STUDY/MITIGATED NEGATIVE DECLARATION <br /> compared to existing conditions;however, this increase would be minimal when considered in a City- <br /> wide context. <br /> It is not anticipated that new staff or facilities would be needed in order to serve the additional student <br /> population. The Police Department would continue to provide services to the project site and would not <br /> require the construction of a new or expanded police station. Therefore,the proposed project would not <br /> result in a substantial adverse physical impact associated with the provision of additional police facilities <br /> or services. <br /> Schools.Three public school districts serve the project area: the Redwood City School District <br /> (RCSD),the Belmont-Redwood Shores School District(BRSD),and the Sequoia Union High School <br /> District(SUHSD). The RCSD operates the majority of elementary schools. The BRSD oversees one <br /> existing elementary and one future elementary school. The SUHSD includes two high schools and <br /> two charter schools. <br /> The proposed project would operate as a TK-5 charter school within the RCSD. There are currently <br /> 13 elementary schools and 2 middle schools within the RCSD. Hoover Elementary School,which <br /> serves grades K-8,is the closest District school to the site,located about 0.25 miles to the southwest <br /> at 701 Charter Street. The new charter school would serve students primarily from the Fair Oaks <br /> neighborhood as well as other neighborhoods within the District. Students who live within their <br /> school's attendance area have first priority for attending their assigned neighborhood school,which is <br /> based on geographic boundaries. Inter-district transfers are granted based on a lottery system. <br /> The proposed project would not increase the demand for school services within the District;rather, <br /> the proposed school use would serve existing demand for school services within the RCSD and would <br /> increase the District-wide capacity by 480 students. Therefore,the project would not result in a <br /> substantial adverse physical impact associated with the provision of school services. <br /> Parks.The project site is located in an existing light industrial and commercial area. The <br /> nearest recreational space is Hoover Park,which is located approximately 0.25 miles southwest of the <br /> project site. Hoover Park includes 10.18 acres and offers fields for football, soccer and baseball as <br /> well as basketball and playground areas. Students at the new charter school generally would not leave <br /> the site during the school day and would utilize on-site playground facilities during this time. Use of <br /> Hoover Park and other nearby recreational facilities would not increase with the proposed project,as <br /> the proposed school use would serve existing students within the area. As the project would not <br /> substantially increase population in the area(refer to Section XIII,Population and Housing),the <br /> project would not substantially increase demand for parks and recreation services and would therefore <br /> not result in a substantial adverse physical impact associated with the provision of park and <br /> recreational facilities. <br /> Other Public Facilities.The Fair Oaks Library Branch and Fair Oaks Community Center are <br /> located within 0.6 miles of the project site. Given that the proposed project would not increase <br /> population in the area(refer to Section XIII,Population and Housing),the project would not <br /> substantially increase demands for other public facilities, such as libraries. <br /> P:1RWC1401B Rocketship Sch-I\PRODUCrSUS-MND1Public\Ra ketship Public Review 09-29-16.docx(09/29/16)PUBLIC REVIEW DRAFT 78 <br /> ATTY/RESO.0084/CC RESO ADOPTING CEQA-ROCKETSHIP CHARTER SCHOOL APPEAL <br /> REV:09-05-17 VR Page 86 of 124 <br />
The URL can be used to link to this page
Your browser does not support the video tag.