My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2017-09-11 Closed and Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2017
>
AgdaPkt 2017-09-11 Closed and Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2017 12:51:50 PM
Creation date
9/7/2017 6:06:39 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
9/11/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
530
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.A. - Page 128 <br /> LSA ASSOCIATES, INC. ROCKETSHIP REDWOOD CITY ELEMENTARY SCHOOL PROJECT <br /> SEPTEMBER 2016 INITIAL STUDY/MITIGATED NEGATIVE DECLARATION <br /> Potentially <br /> Significant <br /> Potentially Unless Less Than <br /> Significant Mitigation Significant No <br /> Impact Incorporated Impact Impact <br /> XVIL UTILITIES AND SERVICE SYSTEMS.Would the <br /> project: <br /> a) Exceed wastewater treatment requirements of the ❑ ❑ ® ❑ <br /> applicable Regional Water Quality Control Board? <br /> b) Require or result in the construction of new water or ❑ ❑ ® ❑ <br /> wastewater treatment facilities or expansion of <br /> existing facilities,the construction of which could <br /> cause significant environmental effects? <br /> c) Require or result in the construction of new storm ❑ ❑ ® ❑ <br /> water drainage facilities or expansion of existing <br /> facilities,the construction of which could cause <br /> significant environmental effects? <br /> d) Have sufficient water supplies available to serve the ❑ ❑ ® ❑ <br /> project from existing entitlements and resources,or <br /> are new or expanded entitlements needed? <br /> e) Result in a determination by the wastewater treatment ❑ ❑ ® ❑ <br /> provider which serves or may serve the project that it <br /> has adequate capacity to serve the project's projected <br /> demand in addition to the provider's existing <br /> commitments? <br /> f) Be served by a landfill with sufficient permitted ❑ ❑ ® ❑ <br /> capacity to accommodate the project's solid waste <br /> disposal needs? <br /> g) Comply with federal,State,and local statutes and ❑ ❑ ❑ <br /> regulations related to solid waste? <br /> a) Exceed wastewater treatment requirements of the applicable Regional Water Quality Control <br /> Board? (Less-Than-Significant Impact) <br /> Wastewater treatment for Redwood City is provided by the Silicon Valley Clean Water(SVCW) <br /> treatment plant. SVCW operates under a joint powers authority(JPA)with four member agencies: the <br /> cities of Redwood City,Belmont,and San Carlos,and the West Bay Sanitary District. Improvements <br /> to the wastewater collection pipelines are ongoing.116 Redwood City has agreements with five San <br /> Mateo County sewer districts in adjacent unincorporated areas to collect and convey wastewater for <br /> 116 Redwood City,City of,2010.Redwood City New General Plan,Draft Environmental Impact Report,Section <br /> 4.15 Utilities. <br /> P:1RWC1401B Rocketship Sch-I\PRODUCrSUS-MND1Pu61ic1Ra ketship Public Review 09-29-16.docx(09/29/16)PUBLIC REVIEW DRAFT 104 <br /> ATTY/RESO.0084/CC RESO ADOPTING CEQA-ROCKETSHIP CHARTER SCHOOL APPEAL <br /> REV:09-05-17 VR Page 112 of 124 <br />
The URL can be used to link to this page
Your browser does not support the video tag.