My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2017-09-11 Closed and Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2017
>
AgdaPkt 2017-09-11 Closed and Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2017 12:51:50 PM
Creation date
9/7/2017 6:06:39 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
9/11/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
530
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TA. - Page 129 <br /> LSA ASSOCIATES, INC. ROCKETSHIP REDWOOD CITY ELEMENTARY SCHOOL PROJECT <br /> SEPTEMBER 2016 INITIAL STUDY/MITIGATED NEGATIVE DECLARATION <br /> treatment. These districts include the Emerald Lake Heights,Fair Oaks,Kensington Square,Oak <br /> Knoll and Edgewood Sewer Districts. The project site is located within San Mateo County's Fair <br /> Oaks Sewer Maintenance District and the wastewater contributions of all of these districts are <br /> considered part of the City's total inflows to the SVCW treatment plant. <br /> The SVCW treatment plant has an operating capacity of 29 million gallons per day(mgd)average dry <br /> weather flow. The plant is permitted by the Water Board to discharge 29 mgd ADWF into San <br /> Francisco Bay. The current permitted peak wet weather capacity of the SVCW facility is 71 mgd. <br /> Redwood City's peak wet weather allocation at the treatment plant is approximately 30.5 mgd.117 <br /> SVCW adopted a 10-year Capital Improvement Program(CIP)in 2008 which will assure that the <br /> facility is able to continue to meet or exceed the wastewater treatment requirements established for it <br /> by the Water Board.18 In addition,the City completed a Sewer Master Plan in 2008,which evaluated <br /> the capacity of the sewer system under existing and future 2030 loading conditions,119 based on land <br /> use assumptions as well as 2030 projections from the Association of Bay Area Governments <br /> (ABAG). The Sewer Master Plan recommended a program of projects to expand the capacity of the <br /> City's wastewater collection system,primarily consisting of new or expanded sewer lines in <br /> prioritized locations. These projects were incorporated into a capital improvement program and are <br /> expected to be implemented over a 10 to 15 year time frame.120 <br /> The proposed project would increase wastewater generation on the site compared to existing <br /> conditions. For the purposes of this analysis,wastewater generation is assumed to be approximately <br /> 90 percent of water usage (the 10 percent differential includes consumed water and water used for <br /> irrigation).As discussed below in Section XVILd,water demand associated with proposed project is <br /> assumed to be 913 gallons per day;therefore,wastewater generation is anticipated to be 822 gallons <br /> per day.Although the project would increase wastewater generation compared to existing conditions, <br /> the increase in demand for wastewater treatment services would result in a less than 0.001 percent <br /> contribution to the daily permitted treatment capacity of the wastewater treatment plant. In addition, <br /> the 2008 Sewer Master Plan and capital improvement program ensure that there is sufficient capacity <br /> available at the SVCW treatment plant to treat additional wastewater flows.Therefore,wastewater <br /> generated from the proposed project would not cause the SVCW to violate any wastewater treatment <br /> requirements and this impact would be less than significant. <br /> b) Require or result in the construction of new water or wastewater treatment facilities or <br /> expansion of existing facilities, the construction of which could cause significant environmental <br /> effects? (Less-Than-Significant Impact) <br /> Wastewater Infrastructure.As discussed in Section XVILa,wastewater treatment for <br /> Redwood City is provided by the SVCW treatment plant and the wastewater collection system is <br /> maintained by the City. The project site would be served by existing wastewater lines and would not <br /> require the construction of new wastewater treatment facilities or the expansion of existing ones. An <br /> 117 ibid- <br /> 118]bid- <br /> 119]bid. <br /> 120 ibid. <br /> P:1RWC1401B Rocketship Sch-I\PRODUCrSUS-MND1Public\Ra ketship Public Review 09-29-16.docx(09/29/16)PUBLIC REVIEW DRAFT 105 <br /> ATTY/RESO.0084/CC RESO ADOPTING CEQA-ROCKETSHIP CHARTER SCHOOL APPEAL <br /> REV:09-05-17 VR Page 113 of 124 <br />
The URL can be used to link to this page
Your browser does not support the video tag.