Laserfiche WebLink
7.A. - Page 130 <br /> LSA ASSOCIATES, INC. ROCKETSHIP REDWOOD CITY ELEMENTARY SCHOOL PROJECT <br /> SEPTEMBER 2016 INITIAL STUDY/MITIGATED NEGATIVE DECLARATION <br /> existing 8-inch PVC sanitary sewer line is located within the vicinity of the site within Charter Street. <br /> The site is currently served by a 6-inch sanitary sewer pipe that connects from the project site to the <br /> City's PVC sanitary sewer line within Charter Street. The proposed project would construct a new 6- <br /> inch sanitary sewer line to connect to the City's PVC sanitary sewer line. The new sanitary sewer line <br /> would be constructed in conformance to City standards. Based on current wastewater patterns at other <br /> Rocketship schools,it is estimated that the proposed project would generate approximately 822 <br /> gallons of wastewater per day(see Section XVILd). The proposed project would connect directly to <br /> the existing sewer lines,which would have sufficient capacity to accommodate the proposed project; <br /> therefore,this impact would be less than significant. Also refer to Section XVILa. <br /> Water Infrastructure.Redwood City's potable municipal water supply is provided by the <br /> Hetch Hetchy regional water system operated by the San Francisco Public Utilities Commission <br /> (SFPUC). The City's water infrastructure system consists of a network of pipelines, storage <br /> reservoirs,and pump stations. There are 13 metered connections to four SFPUC pipelines located in <br /> Redwood City. There are also 10 emergency interties with California Water Service Company,Mid- <br /> Peninsula Water District,and the City of Menlo Park. The potable water system has 265 miles of <br /> distribution mains, 12 storage reservoirs, 10 pump stations,2,397 fire hydrants,and 26 pressure <br /> reducing valves ranging from 2 to 6 inches in diameter.121 <br /> The current SFPUC water supply delivered to Redwood City comes from the Tuolumne River and <br /> local Bay Area reservoirs. This water(referred to as"Hetch Hetchy water"),is conveyed through <br /> pipes and tunnels to the Bay Area and requires only primary disinfection and pH adjustment to <br /> control corrosion in the pipelines.Monitoring the quality of the imported Hetch Hetchy supply is <br /> conducted by the SFPUC.Water that is delivered to Bay Area reservoirs receives filtration and <br /> disinfection treatment at either the Sunol or the Harry Tracy filtration plants. Filtered water from <br /> these treatment plants may be commingled with unfiltered Hetch Hetchy water in Bay Area transmis- <br /> sion pipelines. Water is continuously monitored and tested by SFPUC to ensure that water delivered <br /> to customers meets or exceeds federal and State drinking water and public health requirements. <br /> The City updated its Urban Water Management Plan (UWMP)in 2010,which was adopted in 2011. <br /> According to UWMP,The total capacity of Redwood City's 12 water storage facilities is 21.24 <br /> million gallons and the storage facilities are in excellent condition. Additional water storage tanks are <br /> also planned. Future water demand cited in the Plan is based in part on the 2010 General Plan land <br /> use and population projections.122 <br /> The City also assumes that its recycled water project will meet anticipated recycled water demands in <br /> the year 2030,as indicated in the 2005 UWMP;the recycled water system has been designed to meet <br /> this future demand.12' The recycled water project includes a system capable producing and delivering <br /> up to 3,238 AFY.124 <br /> 121 Redwood City,City of,2010. Urban Water Management Plan.Available online at:www.redwoodcity.or / <br /> publicworks/water/uwmp2011/Final UWMP.pdf(accessed on November 24,2014). <br /> 1221bid. <br /> 121 Redwood City,City of,2010.Redwood City New General Plan,Draft Environmental Impact Report,Section <br /> 4.15 Utilities. <br /> 124 Redwood City,City of,2010. Urban Water Management Plan, op.cit. <br /> P:1RWC1401B Rocketship SchoohPRODUCrSUS-MND1Public\Ra ketship Public Review 09-29-16.docx(09/29/16)PUBLIC REVIEW DRAFT 106 <br /> ATTY/RESO.0084/CC RESO ADOPTING CEQA-ROCKETSHIP CHARTER SCHOOL APPEAL <br /> REV:09-05-17 VR Page 114 of 124 <br />