Laserfiche WebLink
TA. - Page 131 <br /> LSA ASSOCIATES, INC. ROCKETSHIP REDWOOD CITY ELEMENTARY SCHOOL PROJECT <br /> SEPTEMBER 2016 INITIAL STUDY/MITIGATED NEGATIVE DECLARATION <br /> As discussed in Section XVILd,the proposed project would not substantially increase demand for <br /> water and would therefore not exceed the capacity of existing water treatment facilities. The proposed <br /> project would not require the construction of new water treatment facilities,or the expansion of <br /> existing facilities,other than those already planned as part of the City's Water Master Plan.121 <br /> The project site is currently served by water infrastructure and would utilize an existing 2-inch water <br /> line that connects the site to the existing 12-inch water service line located within Charter Street. The <br /> proposed project would connect directly to existing mains,which have sufficient capacity to <br /> accommodate the proposed project. Therefore,the impact of the proposed project on water <br /> infrastructure would be less than significant. <br /> c) Require or result in the construction of new storm water drainage facilities or expansion of <br /> existing facilities, the construction of which could cause significant environmental effects? <br /> (Less-Than-Significant Impact) <br /> Stormwater collection services at the site are provided by the Redwood City Public Works Services <br /> Department.126 Existing storm drainage infrastructure surrounding the site includes a 48-inch storm <br /> drain pipe located within Charter Street and Bay Road. As the project site is already paved,the <br /> proposed project would not increase impervious surfaces at the project site and would not increase the <br /> amount or rate of stormwater runoff from the site. Installation of new landscape areas would instead <br /> increase the amount of pervious surface area. The proposed project would not require or result in the <br /> construction of new stormwater drainage facilities or expansion of existing facilities.Also refer to <br /> Sections IX.a and IX.e. The proposed project would have a less-than-significant impact related to <br /> requirements for new or expanded stormwater drainage facilities. <br /> d) Have sufficient water supplies available to serve the project from existing entitlements and <br /> resources, or are new or expanded entitlements needed?(Less-Than-Significant Impact) <br /> As previously discussed,potable water to the site is provided by the Hetch Hetchy regional water <br /> system operated by the SFPUC. The City updated its Urban Water Management Plan (UWMP)in <br /> 2010(based on General Plan growth projections)which describes existing and planned sources of <br /> water available in the water system service area over the next 20 years,in 5-year increments.127 The <br /> City also signed an individual Water Supply Agreement(WSA)with the SFPUC in 2009,which <br /> guarantees Redwood City a supply of 10.93 million gallons per day of water on an annual-average <br /> basis during a normal year.128 According to the UWMP,the water demand projections for Redwood <br /> City remain well below the SFPUC supply amount until at least 2030,dependent upon continued <br /> expansion and utilization of the City's Recycled Water Program.129 With a guaranteed water supply <br /> from the SFPUC,implementation of conservation measures,and the expanded use of recycled water, <br /> Redwood City has sufficient water supply to support planned future growth. <br /> 125 lbid. <br /> 126 Redwood City,City of,2010.Redwood City New General Plan,Draft Environmental Impact Report,Section 4.8 <br /> Hydrology and Water Quality. <br /> 127 Redwood City,City of,2010. Urban Water Management Plan, op.cit. <br /> 128 ibid. <br /> 129 lbid. <br /> P:1RWC1401B Rocketship Sch-I\PRODUCrSUS-MND1Pu61ic1Ra ketship Public Review 09-29-16.docx(09/29/16)PUBLIC REVIEW DRAFT 107 <br /> ATTY/RESO.0084/CC RESO ADOPTING CEQA-ROCKETSHIP CHARTER SCHOOL APPEAL <br /> REV:09-05-17 VR Page 115 of 124 <br />