My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2017-09-11 Closed and Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2017
>
AgdaPkt 2017-09-11 Closed and Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2017 12:51:50 PM
Creation date
9/7/2017 6:06:39 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
9/11/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
530
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
D <br /> Table 1: Mitigation Monitoring and Reporting Program <br /> Timeframefor Responsibility for Oversight of N <br /> Impact MitigationMeasures Implementation Implementation Imnlementation (0 <br /> (D <br /> Seepreviouspage CUL-1b Continued Seepreviouspage Seepreviouspage Seepreviouspage <br /> 41 <br /> This mitigation may include,but is not limited to,a 41 <br /> thorough recording of the resource on Department of Parks <br /> and Recreation Form 523 records,or archaeological data <br /> recovery excavation.If data recovery excavation is <br /> warranted,CEQA Guidelines Section 15126.4(b)(3)(C), <br /> which requires a data recovery plan prior to data recovery <br /> excavation,shall be followed.If the significant identified <br /> resources are unique archaeological resources,mitigation of <br /> these resources shall be subject to the limitations on <br /> mitigation measures for archaeological resources identified <br /> in CEQA Sections 21083.2(c)through 21083.2(f). <br /> Construction activities associated CUL-2:Ifpaleontologicalresources are encountered during During all ProjectApplicant Redwood City <br /> with the proposed project could site preparation or grading activities,all work within 50 feet phases of Community <br /> uncoverpalcontological of the discovery shall be redirected until a qualified paleon- construction. Development <br /> resources beneath the surface of tologist has assessed the discoveries and made a determina- Director <br /> the project site. tion of the resource's significance,and the City of Redwood <br /> City and County of San Mateo shall be notified.Paleonto- <br /> logical resources include fossil plants and animals,and <br /> evidence of past life such as trace fossils and tracks. <br /> If the paleontological resources are found to be significant, <br /> adverse effects to such resources shall be avoided by project <br /> activities to the extent feasible.If project activities cannot <br /> avoid the resources,the adverse effects shall be mitigated in <br /> accordance with CEQA Guidelines Section 15126.4(b)(3). <br /> Mitigation may include data recovery and analysis, <br /> preparation of a final report,and the formal transmission or <br /> delivery of any fossil material recovered to a paleontologi- <br /> cal repository,such as the University of California Museum <br /> ofPaleontology(UCMP).Upon completion ofproject <br /> activities,the final report shall document methods and <br /> findings of the mitigation and be submitted to the City of <br /> Redwood City,County of San Mateo,and a suitable <br /> paleontological repository. <br /> ATTY/RESO.0084/CC RESO ADOPTING CEQA—ROCKETSHIP CHARTER SCHOOL APPEAL <br /> REV:09-05-17 VR <br /> Page 4 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.