Table 1: Mitigation Monitoring and Reporting Program <br /> Timeframe for Responsibility for Oversight of <br /> Impact MiflffationMeasures Implementation 1111Dlementation Imnlementatlon <br /> VL GEOLOGY AND SOILS <br /> There is a potential for GEO-1 a:The recommendations of the Geotechnical Prior to issuance ProjectApplicant Redwood City <br /> liquefaction to occur at the Investigation Report completed for the project shall be of building or Community <br /> project site during a seismic incorporated into all design and engineering plans, gradingpermits Development <br /> event. including,but not limited to,recommendations related to: Director <br /> site stripping,demolition of existing pavements,abandon- <br /> ment of utilities,removal of existing fill material,soil County of San <br /> stabilization,and installation ofnew pavements. Mateo Public <br /> Furthermore,a licensed Geotechnical Engineer shall be Works Director <br /> retained to review the geotechnical aspects of the design and <br /> engineering plans.The Geotechnical Engineer shall be <br /> allowed sufficient time to provide the project design team <br /> with comments prior to the issuance of the final plans.The <br /> final design and engineering plans shall be submitted for <br /> review and approval to the Redwood City Community <br /> Development Department and to the San Mateo County <br /> Department of Public Works and Building Inspection's <br /> Geotechnical Section prior to the issuance of any site- <br /> specific building or grading permits. <br /> v <br /> D <br /> v <br /> m <br /> ATTY/RESO.0084/CC RESO ADOPTING CEOA—ROCKETSHIP CHARTER SCHOOL APPEAL <br /> REV:09-05-17 VR C31 <br /> Page 5 of 9 <br />