My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2017-09-11 Closed and Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2017
>
AgdaPkt 2017-09-11 Closed and Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2017 12:51:50 PM
Creation date
9/7/2017 6:06:39 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
9/11/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
530
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Table 1: Mitigation Monitoring and Reporting Program <br /> Timeframe for Responsibility for Oversightof <br /> Impact Miti ationMeasures Implementation Implementation Im lementation <br /> VIII.HAZARDS AND HAZARDOUS MATERIALS <br /> The proposed project could HAZ-1:Prior to the City and County issuance of a building Prior to issuance Project Applicant Redwood City <br /> potentially release known permit,the project sponsor shall provide to the City and of building permit Community <br /> subsurface contaminants. County a concurrence letter from the DTSC that indicates Development <br /> the proposed use of the site as a school poses no Director <br /> unacceptable health risks to project users associated with <br /> residual subsurface contamination. Departsnentof <br /> Toxic Substances <br /> The project sponsor shall continue to work with the DTSC Control <br /> so that any potential additional health risks to future site <br /> users from subsurface contaminants is reduced to less than 1 <br /> x 10-6(one in one million)for carcinogens and a hazard <br /> index of 1.0 for non-carcinogens,or as otherwise required <br /> by the DTSC.The project sponsor shall submit work plans <br /> to the regulatory agency for approval,prior to initiating any <br /> remedial action(s).Project construction shall not be <br /> permitted until the DT SC has determined that subsurface <br /> conditions would not likely cause adverse health effects to <br /> future users of the project site,including,as required by <br /> DTSC,ongoing monitoring of indoor VOC vapor <br /> concentrations. <br /> Construction at the project site shall be conducted under a <br /> project-specific Construction RiskManagement Plan <br /> (CRMP),or equivalent document as specified by the DTSC, <br /> to protect construction workers,the general public,and the <br /> environment from subsurface hazardous materials previously <br /> identified and to address the possibility of encountering <br /> unknown contamination or hazards in the subsurface.The <br /> CRMP shall summarize soil and groundwater analytical data <br /> collected on the proj ect site during past investigations, <br /> delineate areas of known soil and groundwater contamina- <br /> tion,and identify soil and groundwater management options D <br /> for excavated soil and groundwater,in compliance with <br /> local,State,and federal statutes and regulations. <br /> v <br /> CD <br /> ATTY/RESO.0084/CC RESO ADOPTING CEOA—ROCKETSHIP CHARTER SCHOOL APPEAL <br /> REV:09-05-17 VR v <br /> Page 7 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.