My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2017-09-11 Closed and Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2017
>
AgdaPkt 2017-09-11 Closed and Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2017 12:51:50 PM
Creation date
9/7/2017 6:06:39 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
9/11/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
530
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Table 1: Mitigation Monitoring and Reporting Program D <br /> Timeframe for Responsibility for Oversight of <br /> Imnact MitigationMeasures Imnlementation Imnlementation Imnlementation <br /> Seepreviouspage HAZ-1 Continued Seepreviouspage Seepreviouspage Seepreviouspage (DD <br /> The CRMP shall:1)provide procedures for evaluating, 00 <br /> handling,storing,testing,and disposing of soil and ground- <br /> water during project excavation and dewatering activities, <br /> respectively;2)require the preparation of a project-specific <br /> Health and Safety Plan that identifies hazardous materials <br /> present,describes required health and safety provisions and <br /> training for all workers potentially exposed to hazardous <br /> materials in accordance with State and federal worker safety <br /> regulations,and designates the personnel responsible for <br /> Health and Safety Plan implementation;3)require the <br /> preparation of a contingency plan that shall be applied <br /> should previously unknown hazardous materials be <br /> encountered during construction activities.The contingency <br /> plan shall be developed by the contractor(s),with the <br /> approval of the DTSC,prior to grading and earthwork <br /> activities.The contingencyplan shall include provisions that <br /> require collection of soil and/or groundwater samples in any <br /> newly discovered affected area by a qualified environmental <br /> professional prior to fixrther work,as appropriate.The <br /> samples shall be submitted for laboratory analysis by a state- <br /> certified laboratory under chain-of-custodyprocedures.The <br /> analytical methods shall be selected by the environmental <br /> professional.The analytical results of the sampling shall be <br /> reviewed by the qualified environmental professional and <br /> submitted to the DTSC.Work shall not resume in the area(s) <br /> affected until these recommendations have been imple- <br /> mented under the oversight of the City or DTSC,as <br /> appropriate;and 4)designate personnel responsible for <br /> implementation of the CRMP. <br /> The CRMP shall be submitted to the City of Redwood City <br /> and County of San Mateo for review and approval prior to <br /> construction activities. <br /> ATTY/RESO.0084/CC RESO ADOPTING CEOA—ROCKETSHIP CHARTER SCHOOL APPEAL <br /> REV:09-05-17 VR <br /> Page 8 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.