Laserfiche WebLink
Table 1: Mitigation Monitoring and Reporting Program <br /> Timeframe for Responsibility for Oversight of <br /> Imnact MitlgationMeasures imnlementation Imnlementation Implementation <br /> The existing building,common HAZ-2:Hazardous building materials surveys shall be Prior to issuance ProjectApplicant Redwood City <br /> items inside it,and existing conducted by a qualified and licensed professional for the ofconstruction Community <br /> shed could contain lead-based metal shed and the existing building.All loose and peeling permits Development <br /> paints(LBPs),asbestos- LBP and ACM shall be abated by certified contractor(s)in Director <br /> containing material(ACM), ac cordance with National Emi ssion S tandards for <br /> polychlorinatedbiphenyl Hazardous Air Pollutants guidelines,Bay Area Air Quality <br /> (PCBs),and mercury. Management District,and Division of Occupational Safety <br /> and Health(Cal/O SHA)requirements.All other hazardous <br /> materials shall be removed from buildings prior to <br /> renovation in accordance with applicable regulations. <br /> Completion of the abatement activities shall be documented <br /> by a qualified environmental professional(s)and submitted <br /> to the City and/or San Mateo County for review with <br /> applications for issuance of construction permits. <br /> Source: LSA Associates,Inc.,2016 <br /> v <br /> D <br /> v <br /> ATTY/RESO.0084/CC RESO ADOPTING CEQA—ROCKETSH I P CHARTER SCHOOL APPEAL (D <br /> REV:09-05-17 VR <br /> A <br /> Page 9 of 9 <br />