My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2017-09-11 Closed and Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2017
>
AgdaPkt 2017-09-11 Closed and Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2017 12:51:50 PM
Creation date
9/7/2017 6:06:39 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
9/11/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
530
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.A. - Page 154 <br /> or materials that are imitative of other materials. <br /> e. The project includes new landscaping to improve the natural appearance of <br /> the site. There are no natural features on the site (including trees, shrubs, <br /> creeks, and rocks), and the natural grade of the site will be retained. <br /> f. Off-street parking areas are accessible from Charter Street and Bay Road <br /> and the applicant has incorporated design features to improve the usability <br /> and safety of the off-street parking area including: a double-loaded on- <br /> site driveway to contain drop-off and pick-up vehicles on the site; restriction <br /> of left turns from Charter Street into the driveway with a modified driveway <br /> at Charter Street; and improvements to the sidewalk at the corner of <br /> Charter Street and Bay Street with a new bulb out and accessible ramps. <br /> The Project therefore takes into account the relation of parking areas to <br /> traffic on adjacent streets. <br /> g. Landscaping is included in the Project to provide screening of the building <br /> and parking areas, screen the new play area from the public right-of-way and <br /> break up the large expanse of paved area with a mix of planting surfaces. <br /> Creeping fig will be planted adjacent to the building to screen the mass of <br /> the building and new trees and bushes will be planted in the playground <br /> and parking area to screen these areas. <br /> h. The proposed improvements to the building and site are compatible with <br /> the character and value of the nearby residential neighborhood, which is <br /> approximately 365 feet away. The existing building would remain at its <br /> current size. The building exterior appearance will be enhanced through the <br /> placement of new windows, arbors, and landscaping in a manner that is <br /> compatible with adjacent uses. <br /> i. New permeable areas and landscaping swales are included on the site to <br /> retain drainage and capture and treat stormwater runoff prior to its <br /> discharge from the site. <br /> Section 5. The Conditional Use Permit and Architectural Permit are hereby <br /> approved based on the City Council's consideration in accordance with the plans, <br /> details and descriptions contained therein, and subject to the Conditions of Approval <br /> attached hereto as Exhibit A and incorporated herein by reference. <br /> Section 6. This Resolution is effective upon its adoption. <br /> ATTY/RESO.0085/CC RESO DENYING APPEAL AND APPROVING CUP&AP—ROCKETSHIP CHARTER SCHOOL APPEAL <br /> REV:09-03-17 VR <br /> Page 5 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.