Laserfiche WebLink
7.A. - Page 153 <br /> neighborhood traffic impacts. The Project will not generate significant <br /> noise. <br /> b. Adequate public and private facilities such as utilities, landscaping, parking <br /> spaces and traffic circulation measures are or will be provided for the <br /> proposed use, in that as noted in the IS/MND, the Project can be served <br /> by utilities, will not impact public services, provides adequate on- site <br /> parking and will not result in traffic impacts. The required number of <br /> parking spaces for a school use are provided, and the spaces in the rear of <br /> the Project Site are one foot shorter than current standards, which will not <br /> significantly impact the ability of vehicles to park in those spaces. <br /> c. Additional floor area or other site development does not occupy existing <br /> available parking area, in that the Project would be accommodated within <br /> the existing building; no additional floor area would be constructed and <br /> existing parking at the rear of the building would be maintained. The <br /> Project complies with number of on-site parking spaces required per the <br /> City zoning code. <br /> d. Adverse parking impacts on adjacent properties will not result, in that the <br /> Project complies with the number of on-site parking spaces required per <br /> the C i ty zoning code. These spaces would continue to be accessed via the <br /> existing driveway on Charter Street. <br /> e. Parking is provided for any additional floor area or other expansion in <br /> compliance with [Zoning Code Article 33], in that the Project does not include <br /> construction of additional floor area and the number of on-site parking spaces <br /> required under the Zoning Code for a school use are provided on-site. <br /> Section 4. Architectural Permit (2014-20) Findings (Zoning Ordinance <br /> Section 45.7): The City Council finds that: <br /> a. There is sufficient variety in the design of the structure and grounds to <br /> avoid monotony in the external appearance. The building exterior <br /> appearance will be enhanced through the placement of new windows, <br /> arbors, and landscaping. <br /> b. The size and design of the structure is in proportion to the building site <br /> and it has a balance and unity among its external features so as to <br /> presents a harmonious appearance. The existing building would remain at <br /> its current size. The building exterior appearance will be enhanced through <br /> the placement of new windows, arbors, and landscaping in a manner that is <br /> harmonious with the unaltered portions of the building and site plan. <br /> c. The structure conforms to the general character of other structures in the <br /> vicinity, in that the existing building would remain at its current size and will <br /> not alter its contextual relationship with adjacent buildings. <br /> d. The project incorporates quality exterior finish materials, including new <br /> windows, glass roll-up doors, new metal awnings, enhanced exterior color <br /> palette and improvements to the existing perimeter fence, and does not <br /> incorporate excessive ornamentation, temporary or second hand materials, <br /> ATTY/RESO.0085/CC RESO DENYING APPEAL AND APPROVING CUP&AP—ROCKETSHIP CHARTER SCHOOL APPEAL <br /> REV:09-03-17 VR <br /> Page 4 of 12 <br />