Laserfiche WebLink
TA. - Page 157 <br /> 12. Exterior Lighting — Provide a lighting plan for proposed exterior lighting, including <br /> cut sheets, a photometric site plan demonstrating light levels and a diagram showing <br /> light spillover. This information shall be included in the building permit plans. New <br /> light sources must not introduce glare or light effects that spill off the property. <br /> [COA][PLANNING] <br /> 13. Bicycle Parking — Provide for 25 bicycle storage spaces and demonstrate this on <br /> the building permit plans. [COA][ENGINEERING] <br /> 14. Electric Vehicle Charging Stations — Provide for 2 onsite parking spaces equipped <br /> with electrical vehicle (EV) charging stations (minimum of 3%) and demonstrate this <br /> on the building permit plans. [COA][ENGINEERING] <br /> Reports and Surveys <br /> 15. As-Builts — Provide "as-built" or "record" drawings, to be submitted in paper, PDF <br /> and AutoCAD formats prior to building permit final. [COA][ENGINEERING]. <br /> Utility Infrastructure Improvements <br /> 16. Conformance with the City's Engineering Standards — All public improvements <br /> shall be designed and constructed in accordance with the City's Engineering <br /> Standards. ][ENGINEERING] <br /> 17. Encroachment Permits — Obtain an Encroachment Permit from the Community <br /> Development Department for work listed below. This permit shall be obtained prior to <br /> the commencement of construction of the road, utilities, or any site improvements. <br /> rSDR][ENGINEERING] <br /> a. Work related to the Redwood City public water mains within Charter Street <br /> and/or Bay Street, including but not limited to new service connections or <br /> alterations to existing service connections. <br /> 18. Water Service — The current domestic water service for the site is provided via a 2" <br /> meter on a 2" service line. There is also a separate 8" fire service line. If it is <br /> determined that a larger domestic water meter and/or water service line is required <br /> to serve the project, the applicant shall contact the Engineering Department and <br /> obtain an encroachment permit, if necessary, to perform the upgrade. <br /> [COA][ENGINEERING] <br /> 19. Backflow Protection — Backflow protection on fire protection water services <br /> and domestic water services is required. The backflow preventer shall be <br /> above grade and located on private property, accessible to the Public Works <br /> division for testing. [COA][ENGINEERING] <br /> 20. C3 Requirements - Plans shall be designed to meet C3 requirements of the <br /> Municipal Regional Permit (MRP) NPDES Permit CAS 612008. <br /> The project is made up of two parcels, of which one is within the City of Redwood <br /> City and the other is within unincorporated San Mateo County. The parcel within <br /> the City contains the building and a smaller, rear parking area, which the applicant is <br /> ATTY/RESO.0085/CC RESO DENYING APPEAL AND APPROVING CUP&AP—ROCKETSHIP CHARTER SCHOOL APPEAL <br /> REV:09-03-17 VR <br /> Page 8 of 12 <br />