My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2017-09-11 Closed and Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2017
>
AgdaPkt 2017-09-11 Closed and Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2017 12:51:50 PM
Creation date
9/7/2017 6:06:39 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
9/11/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
530
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TA. - Page 159 <br /> 27. Access Easement — An egress easement shall be recorded against the adjacent <br /> parcel (APN 054-081-010) providing access from the building to the public way. <br /> Construction-Related Activities <br /> 28. Hours of Construction — Construction activity is permitted between 7:00a.m. and <br /> 8:00 p.m. Monday through Friday, except as permitted on weekends by the Building <br /> Official, and shall adhere to the City's Noise Ordinance. If possible, the noisiest <br /> construction activities would be scheduled for daytime hours when the ambient noise <br /> levels are highest. fSDR [BUILDING] <br /> 29. Construction Meetings — The applicant is required to contact the Permit Counter <br /> (650.780.7350) to schedule the following meetings prior to or during construction. <br /> [COA][BUILDING] <br /> a.Pre-Submittal — Prior to building permit submittal, schedule a pre- submittal meeting <br /> with Building, Planning, Engineering and Fire staff to discuss the permitting process <br /> and submittal requirements. <br /> b. Pre-Construction - After City permits are issued, but prior to start of construction, <br /> schedule a pre-construction meeting with Engineering, Building, Fire, and Planning <br /> staff to discuss the inspection process and requirements for construction and site <br /> work. The applicant shall arrange for the attendance of the owner, developer, <br /> construction manager, contractor, and all subcontractors who are responsible for <br /> grading and erosion and sedimentation protection controls. <br /> 30. Certification Letters - Prior to final inspection, submit certification letters from the <br /> following architects verifying that the project, as constructed, complies with approved <br /> plans. After the certification letter has been submitted, the project planner will also <br /> confirm substantial compliance with the approved plans during the scheduled final <br /> inspection. [COA][PLANNING]: <br /> a. Project Landscape Architect verifying substantial conformance with the <br /> approved landscape plan, including species, size, quantity, and location of <br /> the approved trees, shrubs, and groundcover. It shall also verify landscape <br /> lighting, fencing, irrigation, and other details as applicable. <br /> b. Project Architect verifying substantial conformance with the approved <br /> elevations, colors, materials, exterior light fixtures, and architectural details. <br /> 31. DTSC Compliance — Prior to the issuance of a building permit, the applicant shall <br /> provide the City a concurrence letter from DTSC that indicates the proposed use of <br /> the site as a school poses no unacceptable health risks to project users associated <br /> with residual subsurface contamination. <br /> ATTY/RESO.0085/CC RESO DENYING APPEAL AND APPROVING CUP&AP—ROCKETSHIP CHARTER SCHOOL APPEAL <br /> REV:09-03-17 VR <br /> Page 10 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.