My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2017-09-11 Closed and Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2017
>
AgdaPkt 2017-09-11 Closed and Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2017 12:51:50 PM
Creation date
9/7/2017 6:06:39 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
9/11/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
530
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TA. - Page 212 <br /> P. 1 <br /> 1 <br /> mow _ <br /> I <br /> C � F :,PR.I <br /> ENGINEERING , <br /> June 16, 2017 <br /> Dave Tanner <br /> Dave Tanner, Inc. <br /> 3046 Woodside Road <br /> Woodside, CA 94062 <br /> RE: Response to Comments on PRISM Engineering Traffic Study Review of Rocketship <br /> Charter School Application <br /> Dear Dave, <br /> PRISM Engineering has reviewed the comments made by the project applicant's traffic engineer <br /> pertaining to our comments on their report. In general, their comments pertaining to our review <br /> did not adequately address the concerns we raised, and in some cases, did not address them at <br /> all. In the pages that follow we summarize some of this with specific examples. It is o ur position <br /> that the traffic study is deficient and does not adequately address level of service concerns (as <br /> per County and Caltrans standards), ignores safety issues pertaining to veryyoung children(ages <br /> 5-11)walking in an industrial zoned area shared with frequent trucks (The school is proposed for <br /> a non-residential zoned area), etc. <br /> Please do not hesitate to contact me with any questions or concerns. <br /> Sincerely, <br /> PRISM Engineering <br /> -11 <br /> Grant Johnson, TE <br /> Principal <br /> 1. PRISM Engineering original statement: '?here is actually an observable LOS F condition at the <br /> Woodside and Bay Road intersection during the am peak hour because of blockage of traffic backing <br /> up from the US 101 interchange. This results in the northbound traffic on Woodside having a stop <br /> and go condition. Traffic does not freely flow through this intersection. I observed in the field while <br /> counting the traffic at Woodside and Bay that the northbound approach was at LOS F conditions <br /> because of this,and that the northbound approach was 42%of the total traffic at this intersection." <br /> JEW I <br /> It <br /> -,� AV„�PR1 Rt1YG www,prism.engineering <br />
The URL can be used to link to this page
Your browser does not support the video tag.