Laserfiche WebLink
Deliverables include the following for each of the four projects to meet the grant <br /> submission deadline of November 1St 2017: <br /> • Benefit-Cost Analysis Narrative Report documenting the benefit-cost analysis <br /> approach , assumptions and data inputs. <br /> • FEMA Benefit-Cost Analysis Report, exported from the FEMA BCA software. <br /> • FEMA BCA Export File from the FEMA BCA software. <br /> • Update G&E Engineering Systems reports for the three water tanks. <br /> Cost Estimate <br /> The estimated level of effort for the Consultant is 160 hours, an average of 40 hours <br /> per project, although the effort will likely vary between the projects. <br /> The billing rate for Kenneth Goettel's professional time is $210.00 per hour. <br /> For John Eidinger (G&E Engineering Systems Inc. ) , a subcontractor to Goettel & <br /> Associates Inc. , the cost estimate is $4 , 000 at a billing rate of $244. 00 per hour. <br /> No travel is anticipated for this project and no other direct costs will be billed to this <br /> project. <br /> Total not-to-exceed amount: $37,600. As always, Consultant will complete the <br /> project with the minimum number of hours of professional time commensurate with <br /> generating robust, credible documentation to maximize the likelihood of FEMA grant <br /> awards. <br /> REV: 08-28-17 PR <br /> Page 10 of 14 <br /> ATTY/AGR.2017.200/Goettel & Associates inc. <br />