My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2017-10-02 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2017
>
AgdaPkt 2017-10-02 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2017 9:39:04 AM
Creation date
9/28/2017 3:13:11 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
10/2/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.1.A. - Page 18 <br />umi i r of SAN MATEO <br />ME DEPARTMENT OF PUBLIC WORKS <br />FLOOD RESILIENCE PROGRAM <br />Exhibit A <br />Task 1. Initial Hydraulic Analysis, Conceptual Design, and Review: A planning and design team <br />will review previous hydraulic analysis and prepare preliminary designs necessary to initiate <br />environmental permit negotiations. These initial designs will be reviewed in a Preliminary Design <br />Review Workshop. This workshop will provide an opportunity for Cargill, a key stakeholder to <br />review the proposed design. Consultants with potential conflict of interest will be excluded as the <br />lead for this initial task. <br />Task 2. Land and Easement Negotiations: Land and easement negotiations with Cargill, Caltrans, <br />and West Bay Sanitary District will be facilitated by the planning and design team to secure <br />anticipated easements or to negotiate access for construction activities. <br />Task 3. Environmental Review and CEQA/NEPA Documentation: The environmental permitting <br />team will prepare the necessary documents. The planning and design team will support the <br />environmental permitting team through review, project description, and the purpose and need <br />statements. This task will build upon the work completed by others for the SBSPRP Phase 2 <br />EIR/EIS. <br />Task 4. Final Design and Construction Documents: Plans and specifications will be prepared at <br />the 60%, 90%, and 100% design stages. The final deliverable will be a set of construction ready <br />plans, specifications and engineering estimates (PS&E). This Task will include construction <br />permitting and grant acquisition. <br />Task 5. Bidding and Construction: Construction services such as contract bidding support, <br />support for requests for information (RFI), and construction services will be part of an amended <br />MOU or separate agreement. <br />Cost and Funding: <br />Current estimates for planning, design, environmental permitting, and land negotiation tasks are <br />estimated at approximately $1,000,000. The initial funding contribution for this work from each jurisdiction <br />was estimated based on the percentages listed in the flow allocations listed in Table 1, which will be <br />reviewed under consultant Task 1. The Town of Woodside has decided not to participate and the 3.5% <br />financial responsibility will be by flow contributuion across the Collaborative. The updated MOU financial <br />contribution percentages are as follows: Town of Atherton - 39.8%, City of Redwood City - 26.1 %, County <br />of San Mateo - 22.6%, City of Menlo Park - 11.5%, and Town of Woodside - 0.0%. This MOU includes all <br />consultant costs to complete this PROJECT incurred as of the Notice to Proceed to the Consultant of <br />September 26th, 2017(s). Funding contributions per jurisdiction, for construction, and operations and <br />maintenance will need to be assessed and negotiated in an amended MOU or separate agreement. The <br />Collaborative will actively pursue grant opportunities for funding planning, design, and construction <br />throughout the duration of the MOU. Any grant awards will be distributed by contribution percentages, <br />resulting in an overall reduction of project costs. <br />See Future Work below for potential reallocation of contributions. <br />Public Outreach and Education: <br />A public outreach and education plan will be developed as part of the project. This outreach plan will be <br />used to inform and educate the public and other stakeholders on the specifics of existing flood risks, <br />potential solutions, and necessary green/grey infrastructure and operation and maintenance investments <br />F:� Users �FloodResilienceProgram � EF001 BayfrontCanaA02 MOU�2017-09-12 MOU Final Drafti20170912_Bayfront ExibitA_Draft.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.