a - COUNTYoF SAN MATEO <br />o DEPARTMENT OF PUBLIC WORKS <br />u <br />FLOOD RESILIENCE PROGRAM <br />Exhibit A <br />6.1.A. - Page 19 <br />needed to alleviate flooding in the area. Consistent messaging and informational materials will be shared <br />with the Collaborative to publish on their respective websites and for public distribution. The goal of this <br />effort is to ensure that the impacted communities and stakeholders have a clear understanding of the <br />flood risk reduction this Project will provide, and to educate them on other projects in the system that will <br />need to be completed to ensure the region remains resilient to flooding to the extent possible. <br />Future Work: <br />The Project is limited to the planning, design, environmental permitting, and easement negotiations <br />necessary to advertise for bidding. The deeds will be held by each jurisdiction. Negotiations of any <br />necessary easements or land acquisitions will be facilitated with support from the County, the <br />Collaborative, and the design Consultant. Future Addendums, MOUs, or Agreements will be required to <br />address the construction and maintenance of the Project. <br />In addition to this Project, potential flood mitigation provided by upstream stormwater retention projects in <br />the Bayfront Canal and Atherton Channel watersheds will be analyzed by the Collaborative as needed. <br />Flow allocations per jurisdiction may need to be adjusted if it appears that upstream detention <br />improvements reduce flow contributions to the Project. Table 2 below describes the potential future <br />projects that may affect the existing flow contribution allocations listed in Table 1. <br />Table 2. Potential Future Projects <br />Project <br />Responsible <br />Goal <br />Cost' <br />Contribution <br />Partv <br />Slough <br />Bayfront Canal and Atherton Channel Flood <br />All Parties <br />Mitigate flooding adjacent to <br />$7,000,000 - <br />N/A <br />Management and Restoration Project <br />Bayfront Canal <br />$8,000,000 <br />Holbrook -Palmer Detention Basin (Las <br />Town of Atherton <br />Retain dry weather flow and first <br />$13,600,000 <br />TBD <br />Lomitas School District) <br />flush for water quality treatment <br />Tide Gate Upgrades <br />All Parties <br />Prevent high tide waters from <br />TBD <br />N/A <br />entering the watershed <br />South Bay Salt Pond Restoration Phase II <br />Coastal <br />Receive flood waters from <br />TBD <br />TBD <br />Athlone Terrace Pump Station <br />Conservancy <br />Bayfront Canal/Atherton Channel <br />TBD <br />TBD <br />Chrysler Pump Station <br />Menlo Park <br />Convey flood waters to Flood <br />$7,000,000 <br />TBD <br />Slough <br />Douglas Ave Pump Station <br />Redwood City <br />Convey flood waters to Bayfront <br />TBD <br />TBD <br />Canal <br />Broadway Pump Station <br />Redwood City <br />Convey flood waters to Bayfront <br />TBD <br />TBD <br />Canal <br />Fifth Ave Pump Station <br />Redwood City <br />Convey flood waters to Bayfront <br />TBD <br />Canal <br />San Mateo <br />Convey flood waters to Atherton <br />Athlone Terrace Pump Station <br />County <br />Channel (ultimately Bayfront <br />TBD <br />TBD <br />Canal) <br />Costs are approximate and do not include <br />construction permitting, easements, or O&M. <br />2 Flow reductions to system will be determined following hydrologic <br />analysis. <br />F:� Users �FloodResilienceProgram � EF001 BayfrontCanaA02 MOU�2017-09-12 MOU Final Drafti20170912_Bayfront ExibitA_Draft.docx <br />