Laserfiche WebLink
Schedule : <br /> Task No. 1 - To be completed within ( 15) working days after contract has been <br /> signed and notice to proceed has been given . <br /> Task No.2 through Task No.3 — To be completed mid December 2017. <br /> Task No.4 — To be determined after construction contract has been awarded . <br /> Construction support includes review of submittals, responding to questions from <br /> the field , one on site review of the Contractor's work upon request and a final walk <br /> through observation report of the completed work. Regularly scheduled job <br /> meetings during construction or periodic on-site inspections are not included in our <br /> scope of work (weekly or bi-weekly meetings). <br /> Not included in the scope of work: <br /> a. Electrical utility design beyond the Project property lines. <br /> b. Fire Alarm system design . <br /> c. Voice Evacuation System Design. <br /> d. Paging / local sound system design . <br /> e. Title 24 required third party review. <br /> f. Title 24 Commissioning . <br /> g. Title 24 certification, testing and documentation . <br /> h . Mechanical controls. <br /> i. Emergency Generator design . <br /> j . Fire Pump design. <br /> k. Photovoltaic System Design. <br /> I. Security System design . <br /> m . CCTV system design . <br /> n. Bid review. <br /> o. Power coordination study etc. <br /> p. Preparation or review of energy rebate applications. <br /> q. Opinion of probable cost. <br /> r. LEED Certification . <br /> s. Value Engineering Reviews. <br /> t. Design using Revit or other BIM software. <br /> Page 11 of 12 <br /> REV: 08-29-17 VR <br /> ATTY/AGR.2017.201/Aurum - Armory Parking Lot Lighting <br />