My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt04 cinema - closing docs
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2004
>
Agmt04 cinema - closing docs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2005 2:27:38 PM
Creation date
12/6/2004 9:14:09 AM
Metadata
Fields
Template:
Agreement
Contractor Name
numerous files
PROJECT NAME
Cinema - closing documents from escrow
RMP File Number
100 bin 24
Date
11/29/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
262
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> Exhibit" A " <br /> Change Order Requests <br /> On Broadway - Garage <br /> Redwood City, CA <br /> November 8, 2004 <br /> COR# Change Order Title Drawings Status <br /> 1 1 Cast in place concrete walls INCLUDED <br /> 2 Mud Slab@ Slab on Grade (ELIMINATED) EXCLUDED <br /> 3 Design Exterior Metal Stud (SHELL ISSUE) EXCLUDED <br /> 4 Cut off Soldier Beams (NOT REQUIRED) EXCLUDED <br /> 5 Cement Treat Subtgrade (ELIMINATED) EXCLUDED <br /> 6 Contaminated Culvert Soil (COROI2) EXCLUDED <br /> 7 FloUfescent Fixtures (REJECTED) EXCLUDED <br /> 8 Water treatment - south wells (BY CHEVRON) EXCLUDED <br /> 9 Glazing & Deluge System INCLUDED <br /> 10 Survey & photo monitoring INCLUDED <br /> 11 1 Added Well for Water level INCLUDED <br /> 12 3 Remove Contaminated Soils INCLUDED <br /> 13 4 Delay by SBC, MCI & PG&E INCLUDED <br /> 14 Impact if no tie back agreement (NO ISSUE) EXCLUDED <br /> 15 2 Costs for Culvert Testing INCLUDED <br /> 16 2 Pothole for additional testing INCLUDED <br /> 17 Fire Hose Locations INCLUDED <br /> 18 Excavation Construction Docs INCLUDED <br /> 19 2 Winterization - Build access road INCLUDED <br /> 20 Paystation - Electrical INCLUDED <br /> 21 3 Underground Obstructions INCLUDED <br /> 22 Added Piles to Design (COR034) EXCLUDED <br /> 23 HV AC Modifications INCLUDED <br /> 24 3 Steel to P-l Level INCLUDED <br /> 25 Water Recycling System (NOT REQUIRED) EXCLUDED <br /> 26 Steel market prices INCLUDED <br /> 27 Revised depth INCLUDED <br /> 28 2 Buried Fuel Tank INCLUDED <br /> 29 2 Winterization - mudcat for rain INCLUDED <br /> 30 OC Jones Night Shifts (NOT DONE) EXCLUDED <br /> 31 Remove Utility Vaults (UTILITY PROJECT) EXCLUDED <br /> 32 Construction Drawings INCLUDED <br /> 33 Striping at Middlefield INCLUDED <br /> 34 mat slab in lieu of piles INCLUDED <br /> 35 3 Expansion Joints INCLUDED <br /> 36 Fireproof @ Beams INCLUDED <br /> 37 Meter dewatering discharge(COR034) EXCLUDED <br /> 38 Remob Ferma for Culvert Demo INCLUDED <br /> 39 3 Added Garage Lighting INCLUDED <br /> 40 Shoring Design - MAT Slab (COR034) EXCLUDED <br /> 41 Added Steel Beams at Podium INCLUDED <br /> 42 Slab on Grade Concrete Mix (COR059) EXCLUDED <br /> 43 Revision to wall types INCLUDED <br /> 44 SOG & Foundation Mix (COR059) EXCLUDED <br /> 45 3 Changes to Security Cameras INCLUDED <br /> 46 3 Cashier's Exchange Window INCLUDED <br /> 47 Added Doors, Frames & Hdwe INCLUDED <br /> lof2 <br /> ~ ...... - .- ... __._ ., ..... ..... ...._.....____"_"__..,,.,__.__...__~,,~._____._._____.__·____._.._._~.~_.__'M..".__~ ".,._ _.,_.__._.___, <br />
The URL can be used to link to this page
Your browser does not support the video tag.