My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt04 cinema - closing docs
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2004
>
Agmt04 cinema - closing docs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2005 2:27:38 PM
Creation date
12/6/2004 9:14:09 AM
Metadata
Fields
Template:
Agreement
Contractor Name
numerous files
PROJECT NAME
Cinema - closing documents from escrow
RMP File Number
100 bin 24
Date
11/29/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
262
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> Exhibit" A" <br /> Change Order Requests <br /> On Broadway - Garage <br /> Redwood City, CA <br /> November 8, 2004 <br /> COR # Change Order Title Drawings Status <br /> 48 Millwork at Office (NOT DONE) INCLUDED <br /> 49 WINTERIZATION - Post 3-3-04 (NONE) EXCLUDED <br /> 50 2 Extended Dewatering INCLUDED <br /> 51 3 Handle Excess Water INCLUDED <br /> 52 Soils Stablization INCLUDED <br /> 53 RFIP0033-Delted Columns($O) INCLUDED <br /> 54 Dewatering - Filtration overage INCLUDED <br /> 55 3 Remove Visqueen INCLUDED <br /> 56 Dewatering coordination INCLUDED <br /> 57 3 Credit for early Pay INCLUDED <br /> 58 4 Credit for Builder's Risk INCLUDED <br /> 59 3 Upgrade Concrete mix INCLUDED <br /> 60 Sawcut Contraction Joints(NOT DONE) EXCLUDED <br /> 61 Adjust Schedule of Values (VOID) EXCLUDED <br /> 62 Added Rebar INCLUDED <br /> 63 Line 10 structure chage INCLUDED <br /> 64 3 Waterstop at Construction Joint INCLUDED <br /> 65 Steel Detail Acceleration (SHELL ISSUE) EXCLUDED <br /> 66 4 Separate Drainage System INCLUDED <br /> 67 Added construction joint INCLUDED <br /> 68 Signage bid overage INCLUDED <br /> 69 Additional G.C. Resources(COR073) EXCLUDED <br /> 70 Simplity Hand Rail INCLUDED <br /> 71 Garage to Shell to Garage INCLUDED <br /> 72 Off-haul Premium INCLUDED <br /> 73 General Conditions INCLUDED <br /> 74 Conduit to City Hall & Lot 2 INCLUDED <br /> 75 Shell Allocated Costs WentzJBHV Agr. ONLY <br /> 76 4 Added SGH visit for walls INCLUDED <br /> 77 Transformer Room Reconfigure INCLUDED <br /> 78 Bulletin #1 drawings INCLUDED <br /> 79 4 RFI #99 - Pilaster at HH-XI INCLUDED <br /> 80 4 Document Reproduction Cost INCLUDED <br /> 81 Pilaster Tops (RFl's 101 & 103) INCLUDED <br /> 82 Security Camera Purchase INCLUDED <br /> 83 Shell VE Bulletin #1 (9-17-04) INCLUDED <br /> 84 Additional document reproduction cost INCLUDED <br /> 85 Reduced Underground Utility Scope INCLUDED <br /> 86 Adjusted Contractor/Owner Agreement WentzJBHV Agr. ONLY <br /> 20f2 <br /> .--" . ~.._ _,·,..~.·..._~__"___.,.~_~.._.,.·.".._.".·~_"~n_'_'__._...." ·.___"._._..______._,_...____..,__."._~"...~._~__._"_. <br />
The URL can be used to link to this page
Your browser does not support the video tag.