Laserfiche WebLink
<br /> Exhibit "C" <br /> , " <br /> Exceptions and Clarifications <br /> .......- On Broadway - Garage .......- <br /> Redwood City, CA <br /> November 8, 2004 <br /> SCOPE OF WORK FOR THE GARAGE INCLUDES all construction work per the updated <br /> drawing log (Exhibit B) with the following exceptions and clarifications: <br /> 1. All Change Order Requests previously incorporated into the contract via Change Orders <br /> 1, 2, 3 and 4 are included in the scope of work as described in those change documents. <br /> 2. Change order requests 20 (Paystation Locations), 38 (Culvert Demolition Delay), 52 <br /> (Over Excavation) and 81 (Pilaster Tops per RFl's 101 & 103) are included as described <br /> in those Change Request documents. <br /> 3. Interior walls will be grey, smooth faced, 8" x 8" x 16" light weight blocks, reinforced and <br /> in-filled. A miscellaneous steel connection will be used at the wall to ceiling intersection <br /> similar to detail 12/A5.02 of the contract documents, dated 6-1-04. <br /> 4. Signage will be per Contract Documents, except for sheets A 10.02, A 10.03, A 10.04 & <br /> A 10.05 dated 6-1-04 which have been revised by International Parking Design by hand <br /> on 7-8-04. <br /> 5. Podium Level Beams will be trowled on smooth finish fireproofing unless not approved by <br /> structural engineer. <br /> 6. Stair Railing to be per alternate five tube detail as provided by International Parking <br /> Design as clarified in RFI #110. <br /> 7. Conduit for data lines to lot 2 and City Hall will include two, one inch conduits from the <br /> attendant's office to Jefferson Street and to Middlefield Road (4 conduit runs total). <br /> These conduits will be run in the slab to five feet outside garage building line. Junction <br /> boxes and connections outside the building to be by others. <br /> 8. Cameras and video recording equipment will be provided as follows: Camera coverage <br /> will be provided at each exit to the garage and at code blue stations. Conduit and <br /> junction boxes for future cameras to increase coverage areas will also be provided per <br /> previously approved Change Order Request #45. <br /> 9. Transformer room configuration will be per Bulletin #1 as issued by International Parking <br /> Design, dated 8-30-04 with associated structural drawings from DES Architects + <br /> Engineers dated 8-30-04. <br /> 10, Furnishing, installation and hook up of parking management equipment is EXCLUDED <br /> 11. Fire Hydrant and underground fire water work in the value of $ 44,271 will be done as <br /> part of the Streetscape work. <br /> 12. Fire Hose Bib Locations are located in garage stair cases and at the base of the vehicle <br /> ramps at each level per the request of the fire marshal. <br /> 13. Dewatering & Filtration System: System is included per Fugro West Inc. design <br /> documents dated July 29, 2004. <br /> 14. Cost of operation and maintenance of the groundwater treatment system as detailed in <br /> Fugro West Inc.'s October 15, 2004 proposal is EXCLUDED. <br /> 15. Document Reproduction Costs: Scope includes reproduction costs of construction <br /> documents for General Contractor and Subcontractors anticipated from the date of this <br /> document moving forward. Reproduction Costs for any added scope by the City of <br /> Redwood City or Developer is EXCLUDED. <br /> 16. All exterior signage including "garage full" sign (sign #46 on sign schedule - sheet <br /> A 10.02) is EXCLUDED. All structural support and power for exterior sign age is <br /> EXCLUDED. <br /> I of I <br /> -. .... .- '. -->.-".._- <br />