Laserfiche WebLink
<br />Cinema Streetscape 2 <br />3. Sidewalk improvements (only) adjacent to the "On Broadway" project on Jefferson Avenue <br />between Broadway Street and Middlefield Road. <br />4. Sidewalk improvements (only) adjacent to the "On Broadway" project on Middlefield Road <br />between Theatre Way/Winslow Street and Jefferson Avenue. <br />FTB will function as the Prime Consultant throughout the project, providing all project <br />management and information distribution and documentation services for the design and <br />engineering team. FTB will refine the streetscape design concept and insure that design intent is <br />maintained among all work products while working with our subconsultant team. Slooten <br />Consulting will compile, print and distribute all construction document sets, including <br />intermediate sets for review by City Staff and the consultant team and final sets used for bidding <br />purposes. During the construction phase, FTB and each sub consultant firm will be responsible <br />for the review of shop drawings and contractor submittals pertaining to the respective products, <br />drawings, and specifications provided by that firm. <br />TASK DESCRIPTIONS <br />Orientation. The tasks as outlined below are FTB-only tasks; please refer to other subconsultant <br />Scope of Services for details of tasks of related disciplines. The task list provides our <br />recommendations as to how the City can proceed most effectively toward the development of <br />plans and designs to address the problems and opportunities at hand. The tasks are listed in the <br />chronological order under which we would expect to proceed under typical conditions. It is <br />important to note, however, that the unique nature of this project in coordination with the on- <br />going On-Broadway project will require both chronological adjustments as well as task <br />substitutions to refine the effectiveness of the services performed. Once the final task list and the <br />overall approach to the problem are approved by the City, the most basic purpose of this task list <br />will be to provide both a preview of the likely type and order of work to be performed as well as a <br />contractual basis for a certain number of meetings, drawings, workshops and tasks to be delivered <br />for the corresponding project budget. <br />PHASE I: DESIGN DEVELOPMENT <br />Task 1. Receive updated digital survey and project base files from Slooten Consulting <br />A. Receive/review digital files and configuration settings, distribute to team <br />B. Coordinate/troubleshoot file and layer parameters <br />Task 2. Prepare schedule for project completion <br />A. Attend working session with PS&E Scheduling Team (meeting #1) Attend working session <br />with PS&E Scheduling Team (meeting #1) - coordinate preliminary schedules, identify critical <br />path elements, list questions for follow up responses by team members <br />B. Prepare Gantt Chart for FTB portion <br />C. Receive/review team schedules; coordinating discussions <br />