Laserfiche WebLink
<br />Cinema Streetscape 5 <br />A. Confinn primary plant material recommendations, clearances, additional parameters <br />1. Date Palm tree <br />2. Deciduous street tree 1 <br />3. Deciduous street tree 2 <br />4. Coordinate with SFE and City Staff on selections (via telephone & fax) <br />B. Secondary plant material selections (coordinate w/SFE & arborist) <br />1. Planter column <br />2. Planter pots <br />3. Median planting (Broadway only) <br />C. Tree wells - aesthetic treatments <br />Task 9. Complete DID Level Design: Add furniture, plant materials, paving patterns, wind <br /> mitigation devices. <br />A. Receive/review file from Slooten Consulting <br />B. Theatre Way - detailed layout & design <br />1. Granite (stone) Paving Layout; restaurant terrace, bands, entryways, street and <br /> parking stalls <br />2. Concrete Paving Layout; banding and special scoring patterns <br />3. Stair curb & no sings <br />4. Plinth (base for planter column) detail <br />5. Roadway & parking/tree area <br />6. Bollard row: Detail design of interface ofbollard and single post-top light with <br /> decorative paving <br />7. Cinema Entry Plaza paving pattern <br />8. Street Gateway areas (2) <br />9. Comer plaza at intersection of Middlefield Road and Theatre Way - Locate all street <br /> furnishings including location ofbollards and railing. <br />10. Utility vault areas <br />11. Sidewalk on west side <br />12. Finalize trench drain details <br />13. Finalize location of all street furniture <br />14. Parking garage slab control joint <br />C. Broadway - detailed layout & design <br />1. Special Theatre Way comer conditions <br />2. Special Jefferson comer conditions <br />3. Median layout and planting <br />4. Drop-off area <br />5. Finalize location of benches, trash receptacles and street trees <br />6. Detail paving design for ADA ramp <br />D. Jefferson Avenue - detailed layout & design <br /> .-.....-....... <br />