Laserfiche WebLink
<br />Cinema Streetscape 6 <br />1. Design of planter or other device at parking garage entrance <br />2. Special sidewalk design treatment near garage entrance, bulb outs etc. <br />3. Finalize location of all street furnishings <br />E. Middlefield Road - detailed layout & design <br />1. Typical sidewalk w/concrete paving pattern <br />2. Comer details (Jefferson at Middlefield Road) <br />3. Trees in parking details including plant materials, curbing detail <br />4. Crosswalk areas <br />5. Finalize location of benches, trash receptacles, and street trees <br />F. Format and transmit electronic files to Slooten Consulting and SFE <br />G. Provide direction, respond to questions from design team subconsultants <br />Task 10. Materials and Finishes Selections - research, specification sheets, samples & <br /> mock-up <br />A. Stone Paving materials; dining terrace, bands, entryways, street <br />B. Concrete Paving; custom colors, banding and special finishes <br />C. Precast concrete colors, materials, finishes <br />D. Metal paint colors, finishes <br />E. Coordination sessions w/ manufacturer reps (at FTB) <br />F. Coordinate w/ contractor on constructed paving mock-up sample, provide general directions <br />G. Coordinate follow-up modifications as required <br />Task 11. Prepare/assemble specification notes; transmit to SFE <br />Task 12. 75% Submittal <br />A. Streetscape plans & specifications Quality Control <br />1. Receive/review single set of streetscape team drawings and specifications from <br /> Slooten Consulting <br />2. Draft and Transmit FTB comments to PS&E team <br />3. Telephone follow-up with team members to review FTB comments <br />B. Custom furnishing Quality Control <br />1. Receive/review drawings and specifications from production architect <br />2. Meeting with production architect to discuss FTB comments <br />C. Attend 75% Review Session Meeting in Redwood City (Meeting #2) <br /> ,._______""_0 <br />