My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt04 Freedman Tung Bottomley
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2004
>
Agmt04 Freedman Tung Bottomley
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2008 8:11:33 PM
Creation date
12/8/2004 11:40:51 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Freedman Tung Bottomley
PROJECT NAME
design for streetscape retail cinema
RMP File Number
100
Date
5/25/2004
MO Ref
RD-04-06 04-77 04-218 RD-05-12 05-186
Amendment
Yes
Box
6589
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Cinema Streetscape 6 <br />1. Design of planter or other device at parking garage entrance <br />2. Special sidewalk design treatment near garage entrance, bulb outs etc. <br />3. Finalize location of all street furnishings <br />E. Middlefield Road - detailed layout & design <br />1. Typical sidewalk w/concrete paving pattern <br />2. Comer details (Jefferson at Middlefield Road) <br />3. Trees in parking details including plant materials, curbing detail <br />4. Crosswalk areas <br />5. Finalize location of benches, trash receptacles, and street trees <br />F. Format and transmit electronic files to Slooten Consulting and SFE <br />G. Provide direction, respond to questions from design team subconsultants <br />Task 10. Materials and Finishes Selections - research, specification sheets, samples & <br /> mock-up <br />A. Stone Paving materials; dining terrace, bands, entryways, street <br />B. Concrete Paving; custom colors, banding and special finishes <br />C. Precast concrete colors, materials, finishes <br />D. Metal paint colors, finishes <br />E. Coordination sessions w/ manufacturer reps (at FTB) <br />F. Coordinate w/ contractor on constructed paving mock-up sample, provide general directions <br />G. Coordinate follow-up modifications as required <br />Task 11. Prepare/assemble specification notes; transmit to SFE <br />Task 12. 75% Submittal <br />A. Streetscape plans & specifications Quality Control <br />1. Receive/review single set of streetscape team drawings and specifications from <br /> Slooten Consulting <br />2. Draft and Transmit FTB comments to PS&E team <br />3. Telephone follow-up with team members to review FTB comments <br />B. Custom furnishing Quality Control <br />1. Receive/review drawings and specifications from production architect <br />2. Meeting with production architect to discuss FTB comments <br />C. Attend 75% Review Session Meeting in Redwood City (Meeting #2) <br /> ,._______""_0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.