My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt04 Freedman Tung Bottomley
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2004
>
Agmt04 Freedman Tung Bottomley
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2008 8:11:33 PM
Creation date
12/8/2004 11:40:51 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Freedman Tung Bottomley
PROJECT NAME
design for streetscape retail cinema
RMP File Number
100
Date
5/25/2004
MO Ref
RD-04-06 04-77 04-218 RD-05-12 05-186
Amendment
Yes
Box
6589
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Cinema Streetscape 7 <br />D. Receive/Review single coordinated set of comments from City Staff <br />E. Follow-up meeting with City Staffre: schedule priorities, milestones etc. <br />F. Memorandum to design & eng team re: final decisions re: changes <br />Task 13. D/D Level Construction Cost Estimate (update to Wentz "concept level" estimate <br /> 18 December 2003) <br />A. Receive/review draft cost estimate; follow-up question & answer. <br />Task 14. Value Engineering Services <br />A. Receive / Review preliminary value engineering infonnation from City Staff <br />B. Discussion with Subconsultants regarding value engineering recommendations <br />C. Attend Meeting in Redwood City to discuss value engineering strategies with contractor <br />Task 15. Prepare detailed list of changes for Project PS&E Team <br />Task 16. Phase I Project Management and Administration <br />This task provides an allowance for project management tasks such as project documentation, <br />invoicing, and record keeping corresponding to tasks to be perfonned in Phase I. <br />PHASE II - COMPLETE CONSTRUCTION DOCUMENTS <br />1. Final Bid Set Submittal <br />A. Assist team to develop design solutions for modifications per 75% Review <br /> 1. Receive/review single set of streetscape team drawings and specifications from <br /> Slooten Consulting <br /> 2. Draft and Transmit FTB comments to PS&E team <br /> 3. Follow-up with team members to review FTB comments <br />B. Custom Furnishing Quality Control <br /> 1. Receive/review drawings and specifications from production architect <br /> 2. Meeting with production architect to review submittal docs <br />Task 2. Advise City Staff on structuring bid add and deduct alternates (as necessary) <br />Task 3. Phase II Project Management <br />This task provides an allowance for project management tasks such as project documentation, <br />invoicing, and record keeping corresponding to tasks to be perfonned in Phase II. <br />
The URL can be used to link to this page
Your browser does not support the video tag.