My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt04 Freedman Tung Bottomley
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2004
>
Agmt04 Freedman Tung Bottomley
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2008 8:11:33 PM
Creation date
12/8/2004 11:40:51 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Freedman Tung Bottomley
PROJECT NAME
design for streetscape retail cinema
RMP File Number
100
Date
5/25/2004
MO Ref
RD-04-06 04-77 04-218 RD-05-12 05-186
Amendment
Yes
Box
6589
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />M E M 0 <br /> SLOOTEN CONSULTING, INC. <br /> SURVEYING, ENGINEERING & GIS <br /> 4740 NORTHGATE BLVD. SUITE 125 (916) 641-7570 <br /> SACRAMENTO, CA 95834 FAX (916) 641-7572 <br /> e-mail: office@slooten.com <br />FROM: Dirk Slooten <br /> Revision 4 ( dated 3-26-2004) <br /> Dear lan, based on a revised submittal schedule and time frame <br /> Here is the preliminary scope and cost based on two submittals <br /> 1) Additional field surveys $ 2,840.00 <br /> ( assume 2 days of field work) <br /> Field crew for 2 days $ 2,000.00 <br /> Technician 12 hours @ $ 70.00 $ 840.00 <br /> 2) Prepare base in formation mapping and distribute to project team <br /> $ 3,600.00 <br /> Principle 8 hours @ $ 100.00 $ 800.00 <br /> Technician 40 hours@ $ 70.00 $ 2,800.00 <br /> 3) Horizontal control plan $ 6,600.00 <br /> ( dimensions and locates all fixed structures <br /> includes revision by Traffic Consultant) <br /> Principle 24 hours @ $ 100.00 $ 2,400.00 <br /> Technician 60 hour @ $ 70.00 $ 4,200.00 <br /> 4) Prepare street improvement plans for Jefferson, Broadway, Middlefield <br /> and Theatre $ 16,800.00 <br /> ( includes elevations for all fixed structures) <br /> Principle 40 hours @ $ 100.00 $ 4,000.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.