Laserfiche WebLink
<br />M E M 0 <br /> SLOOTEN CONSULTING, INC. <br /> SURVEYING, ENGINEERING & GIS <br /> 4740 NORTHGATE BLVD. SUITE 125 (916) 641-7570 <br /> SACRAMENTO, CA 95834 FAX (916) 641-7572 <br /> e-mail: office@slooten.com <br />FROM: Dirk Slooten <br /> Revision 4 ( dated 3-26-2004) <br /> Dear lan, based on a revised submittal schedule and time frame <br /> Here is the preliminary scope and cost based on two submittals <br /> 1) Additional field surveys $ 2,840.00 <br /> ( assume 2 days of field work) <br /> Field crew for 2 days $ 2,000.00 <br /> Technician 12 hours @ $ 70.00 $ 840.00 <br /> 2) Prepare base in formation mapping and distribute to project team <br /> $ 3,600.00 <br /> Principle 8 hours @ $ 100.00 $ 800.00 <br /> Technician 40 hours@ $ 70.00 $ 2,800.00 <br /> 3) Horizontal control plan $ 6,600.00 <br /> ( dimensions and locates all fixed structures <br /> includes revision by Traffic Consultant) <br /> Principle 24 hours @ $ 100.00 $ 2,400.00 <br /> Technician 60 hour @ $ 70.00 $ 4,200.00 <br /> 4) Prepare street improvement plans for Jefferson, Broadway, Middlefield <br /> and Theatre $ 16,800.00 <br /> ( includes elevations for all fixed structures) <br /> Principle 40 hours @ $ 100.00 $ 4,000.00 <br />