My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt04 Freedman Tung Bottomley
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2004
>
Agmt04 Freedman Tung Bottomley
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2008 8:11:33 PM
Creation date
12/8/2004 11:40:51 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Freedman Tung Bottomley
PROJECT NAME
design for streetscape retail cinema
RMP File Number
100
Date
5/25/2004
MO Ref
RD-04-06 04-77 04-218 RD-05-12 05-186
Amendment
Yes
Box
6589
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> Engineer 80 hours @ $ 90.00 $ 7,200.00 <br /> Technician 80 hours @ $ 70.00 $ 5,600.00 <br />5) Prepare Utility plan for any utilities that are to be relocated or newly <br /> constructed, includes relocation of utility meter includes, water sewer <br /> and storm drain ( excludes gas, electric, telephone, cable) Includes a <br /> hydrology study <br /> $ 13,600.00 <br /> Principle 40 hours @ $ 100.00 $ 4,000.00 <br /> Engineer 60 hours @ $ 90.00 $ 5,400.00 <br /> Technician 60 hours @ $ 70.00 $ 4,200.00 <br />6) Signing and stripping plan $ 8,400.00 <br /> Principle 20 hours @ $ 100.00 $ 2,000.00 <br /> Engineer 40 hours @ $ 90.00 $ 3,600.00 <br /> Technician 40 hours @ $ 70.00 $ 2,800.00 <br />7) Prepare details and specifications $ 4,600.00 <br /> excludes special streetscape details <br /> Engineer 20 hours @ $ 90.00 $ 1,800.00 <br /> Technician 20 hours @ $ 70.00 $ 2,800.00 <br />8) Project meetings and coordination $ 6,600.00 <br /> ( includes 4 project meetings <br /> Principle 30 hours @ $ 100.00 $ 3,000.00 <br /> Engineer 30 hours @ $ 90.00 $ 2700.00 <br /> Technician 40 hours @ $ 70.00 $ 2,800.00 <br />9) Construction support $ 9,200.00 <br /> Includes 8 field visits <br /> Principle 60 hours @ $ 100.00 $ 6,000.00 <br /> Engineer 20 hours @ $ 90.00 $ 1,800.00 <br /> Technician 20 hours @ $ 70.00 $ 1,400.00 <br />Total $ 74,140.00 <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.