Laserfiche WebLink
<br /> Engineer 80 hours @ $ 90.00 $ 7,200.00 <br /> Technician 80 hours @ $ 70.00 $ 5,600.00 <br />5) Prepare Utility plan for any utilities that are to be relocated or newly <br /> constructed, includes relocation of utility meter includes, water sewer <br /> and storm drain ( excludes gas, electric, telephone, cable) Includes a <br /> hydrology study <br /> $ 13,600.00 <br /> Principle 40 hours @ $ 100.00 $ 4,000.00 <br /> Engineer 60 hours @ $ 90.00 $ 5,400.00 <br /> Technician 60 hours @ $ 70.00 $ 4,200.00 <br />6) Signing and stripping plan $ 8,400.00 <br /> Principle 20 hours @ $ 100.00 $ 2,000.00 <br /> Engineer 40 hours @ $ 90.00 $ 3,600.00 <br /> Technician 40 hours @ $ 70.00 $ 2,800.00 <br />7) Prepare details and specifications $ 4,600.00 <br /> excludes special streetscape details <br /> Engineer 20 hours @ $ 90.00 $ 1,800.00 <br /> Technician 20 hours @ $ 70.00 $ 2,800.00 <br />8) Project meetings and coordination $ 6,600.00 <br /> ( includes 4 project meetings <br /> Principle 30 hours @ $ 100.00 $ 3,000.00 <br /> Engineer 30 hours @ $ 90.00 $ 2700.00 <br /> Technician 40 hours @ $ 70.00 $ 2,800.00 <br />9) Construction support $ 9,200.00 <br /> Includes 8 field visits <br /> Principle 60 hours @ $ 100.00 $ 6,000.00 <br /> Engineer 20 hours @ $ 90.00 $ 1,800.00 <br /> Technician 20 hours @ $ 70.00 $ 1,400.00 <br />Total $ 74,140.00 <br /> 2 <br />