My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt04 Freedman Tung Bottomley
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2004
>
Agmt04 Freedman Tung Bottomley
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2008 8:11:33 PM
Creation date
12/8/2004 11:40:51 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Freedman Tung Bottomley
PROJECT NAME
design for streetscape retail cinema
RMP File Number
100
Date
5/25/2004
MO Ref
RD-04-06 04-77 04-218 RD-05-12 05-186
Amendment
Yes
Box
6589
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />City of Redwood City: Cinema Streetscape Project Design Development and Construction Documents <br />SFE/Landscape Architects <br />Staffing and Budget Spreadsheet v. 4b CADD Admin. <br />25-Mar-04 Principal Associate Draft Ass!. <br />¡r <br />IB <Hi}} ii_ <br />1. Receive digital files & configuration from FTB 4 <br />2. Attend PS&E Team Scheduling Meeting 4 4 <br />3. Prepare SFE PS&E schedule and submit to FTB for review 2 6 1 <br />4. Coordinate w/FTB re: Draft Grading layout/criteria 4 <br />5. Attend Working Session w/PS&E Team re: Street Geometries 4 4 <br />6. Coordinate w/FTB & Arborist re: Primary & Secondary Plant Selections 2 <br />7. Horticultural Consultation with FTB 8 <br />8. Prepare 75% Complete PS&E Submittal <br />a. Receive/review DO Autocad Design from FTB 1 2 <br />b. Receive/review Engineers CD Base Plans from Slooten Consulting 1 2 <br />c. Format and configure digital files for use as LA base sheets 1 8 <br />d. Prepare LA General Notes, Legend and Abbreviations Sheet 1 4 8 <br />e. Prepare Back of Curb Layout & Reference Plans (4 base sheets) 1 4 16 <br />f. Prepare Planting Plans (4 base sheets) 1 2 12 <br />g. Prepare Back of Curb Construction Detail Sheets (3 sheets) 1 8 32 <br />h. Prepare Planting Detail Sheet (1 sheet) 1 2 8 <br />i. Prepare LA Technical Specification 12 16 <br />j. Package & Submit 75% Theater Way CD's only to FTB for review 1 4 2 <br />9. Attend 75% PS&E Review Session 4 4 <br />10. Value Engineering Coordination 4 <br />11. Phase 1 Project Management & Documentation 12 24 8 <br />- «<H BH<H Hii <br />1. Complete Construction Documents <br />a. Revise LA General Notes, Legend and Abbreviations Sheet 1 4 8 <br />b. Revise Back of Curb Layout & Reference Plans (4 base sheets) 1 4 24 <br />c. Revise Planting Plans (4 base sheets) 1 2 12 <br />d. Revise Back of Curb Construction Detail Sheets (3 sheets) 1 4 32 <br />e. Revise Planting Detail Sheet (1 sheet) 1 2 12 <br />f. Revise LA Technical Specification 4 12 <br />g. Package & Submit Complete CD's to FTB 1 4 2 <br />- IB <br />1. Attend on site progress meeting (4 total, 1/2 Principal) 8 16 <br />2. Submittal Review and Coordination 12 40 12 <br />3. Respond to Requests for Information (RFI) 4 16 4 <br />4. Site Visit and Preparation of LA Punch List 4 8 2 <br />5. Phase 3 Project Management & Documentation 8 16 4 <br /> TOTAL HOURS 121 200 188 71 <br /> HOURLY RATE $150 90 75 50 <br />FEE SUBTOTAL PER BILLING CATEGORY $18,150 $18,000 $14,100 $3,550 $53,800 <br />REIMBURSABLE EXPENSES (4%) $2,152 <br />SFE PROJECT TOTAL $55,952 <br /> ,----,.,.._-> <br />
The URL can be used to link to this page
Your browser does not support the video tag.