Laserfiche WebLink
<br />Basic Services: 75% Contract Documents Phase <br />1. We will meet with the urban designer to review the schematic lighting design, and, where <br /> appropriate, we will suggest alternative designs. <br />2. We will assist the urban designer and the city in setting appropriate lighting level criteria, and we <br /> will perfonn calculations as required to demonstrate that the proposed design meets the criteria. <br />3. After the lighting design is approved, we will refine the design and prepare 75% contract document <br /> lighting design plan layers in AutoCAD to indicate the locations, fixture types, and controls for <br /> lighting in our scope. Our layers will be incorporated by the urban designer into the landscape <br /> drawings and by the design-build electrical subcontractor into the electrical drawings. It should not <br /> be necessary for either the urban designer or the design-build electrical subcontractor to re-draw any <br /> of our layers. <br />4. We will provide a set oflight fixture catalog cuts and the following specification sections in the urban <br /> designer's fonnat for inclusion in the 75% contract documents: <br /> Section 16500: Lighting <br /> Section 16501: Lighting Schedule (for fixtures specified by ARCHITECTURAL LIGHTING DESIGN) <br />5. We will provide preliminary sketches of special lighting details. <br />6. We will attend one design team coordination meeting in this phase. <br />7. We will review the 75% contract documents and send our comments to the urban designer. <br />Basic Services: 100% Contract Documents Phase <br />1. We will update our lighting plan layers as the design progresses and issue this infonnation to the <br /> urban designer and the design-build electrical subcontractor for inclusion in the 100% contract <br /> documents. lfrequired, we will revise the design to meet the owner's budget, based on a cost estimate <br /> prepared at the end of the Design Development Phase. <br />2. We will review the 100% contract documents for coordination between landscape and electrical <br /> engineering drawings pertaining to the lighting design. <br />3. We will provide lighting specification sections for the urban designer's use in assembling the 100% <br /> project manuals. <br />4. We will attend up to two design team coordination meetings in this phase. <br />5. We will provide sketch details of special mounting conditions for standard fixtures. These will be <br /> issued as 8-1/2" x 11" sketches and will be used by the urban designer to develop the appropriate <br /> details. <br />Basic Services: Bidding and Negotiation Phase <br />1. We will assist the urban designer in preparing addenda related to lighting. <br />2. We will review up to one set of proposed substitutions prepared by the contractor. <br /> 2 <br /> ,-.-.,., . <br />