Laserfiche WebLink
,�„ pra <br />4l01 ' <br />m <br />a.4 <br />M_ <br />A motion by Trustee Hynding seconded by Trustee Beeger, that the hearing in the <br />matter of Street Railroad Franchise be pub over until Monday, Dec:. 4th.,191I, <br />730 P.M-, wYA9 carried.. <br />Trustee Hynding moved seconded by Trustee Beeger ,that the <br />Supt. of Streets be authorized to construct a temporary z1d.ewall<- foot bridge on <br />Centre St., and to build bulkhead necessary to protect bridge. Motion carried. <br />Specifications for mecadamizing Jackson St., from County Road <br />to Adams St-•, were approved on motion of Trustee Hynding seconded by Trustee Beeger, <br />Irnsurance Policies presented by Finance Committee on <br />Town Hall insurance, were accepted and warrants ordered drawn for respects ve <br />amounts of same , ({ 032, $24, 097• i' on motion of Trustee Hynding seconded by Trustee <br />e <br />B eager.. <br />new Town Hall. <br />The following are the bids received for heating system in the <br />Fisher &Wolfe --------------- 0320.00 <br />John G.Sutton Co., ------------ 370.00 <br />T )somas W.Alton ,----------- 607:.00,' <br />Mangrum & Otter ------------ 530.00 <br />Geo.J.Becker Co., ---------- 439•.00 <br />The following is the,bid of Fisher & 'Wolfe in detail. <br />Board of Trustees, <br />Redwood Dity, Cal., <br />San Francisco, Cal. Nov. I6th.j911. <br />Gentlemen, <br />We respectfully submit <br />a bid of T21rea:Randred and Twenty dollars for the installation of a Two pipe Hot <br />Fater Heating Plant, with the exception of the boiler, in the new Town Hall in <br />your City. <br />Radistois to be Two column Roccoco Pattern 262., three .hundred square <br />feet in all. Radiators to 'be placed as follows, One in Marshall's Office, General <br />Office, Cita* Clerks, Conference Room, and lower corridor. Two in Committee <br />room and five ILL Asse^bl;% Hall_ Radiators in all instances except the torr&dor, <br />to be located under the windous_ <br />E xpansion tank to be galvanized iron pressure tank with Gauge glassT-an <br />and proper connections with heating; system_ , <br />Each radiator to be provided -with a Nickel plated controlling valve <br />and air valve. <br />All radiators and exposed pipes above the first floor to be bronzed. <br />there pipes pass throw ceilings and floors they are to be neatly <br />fitted with N.P.floor and ceiling plates.. <br />All pipe lines in the basement are to be supported by strong hangers. <br />All flow and return pipes in the basement to be covered writh <br />asbestocell pipe neatly applied. <br />Pipe to be standard :refight and sizes_ Fittings to be gray cast iron. <br />The '410199 to be -constructed in a thorough and workmanlike manner. <br />. Yours Truly, <br />Fisher & Wolfe. <br />P -8- Tris figtL-W is based an the supposition that the piping can be done before the <br />aZe IF-1d. <br />for I <br />the I <br />In s <br />the <br />char <br />Trus <br />to t <br />matt <br />