Laserfiche WebLink
W! <br />177 <br />E.H.Sampson. <br />President of the Board of Trustees of the Town <br />of Redwood City. <br />----------------------- APrice <br />=.T _ Clerk of the Town of Redwood Cit y- <br />j I hereby approve the foregoing Resolution this 28th.day of Aygust,19i6- <br />�{� E -H -Sampson. <br />-------------------------------------------- <br />President of the Board of Trustees of the Town <br />of Redwood City. <br />The following are the bids received for the construction of sewers,artifioial,stone curbs, <br />and sidewalks on Arlington Road,Edgewood Road,Woodstock Plaoe,and Melrose Place,and were <br />publicly opened examined and declared. ( Job # II <br />*-T.0-Rioe- <br />5010 ou.yds-ew0av---------------- 5 <br />--------------------� oats. ou.ya. <br />1 80 cu.yds. fill ------------- ----------------- -----,@ 50 ots. cu -yd. <br />71050 sq.ft.macadamizing---------------------------- @-0675 sq.ft. <br />I 71050 ft -of oiling----------------------------------- @ 03 ets- sq.ft. <br />I <br />3275 lin ft -con curb --------------------------------- @ 38 ots, lin ft. <br />15945 sq-ft.of sidewalk ------------------------------ @145 0ts. sq.ft. <br />680 lin ft.of 6" sewer pipe------------------------ 0 48 ate. lin ft. <br />995 lin ft of 8" sewer pipe------------- @ 60 ots-lin ft. <br />1400 lin ft -of 4" sewer pipe------------------------ @ 41 ets.lin ft. <br />�4 61, X 4,, wyes------------------------------ - @ 50 each. <br />21 8" X 4" wyes-------------------------------- @ 1.00 each. <br />6 brick manholes & covers---------------------- @ 35.00 each. <br />Western Motor Draying Co. <br />5010 ou.yds.excaz--------------------------------- @45 ots.ou,yd. <br />80 ou yds.fill---------------------------------- @I0 ots.ou.yd- <br />71050 sq.ft.macadamizing--------------------------- @07 ots.sq.ft. <br />71050 ft.of oiling--------------------------------- @o250ts.sq.ft. <br />3275 lin ft.con curb------------------------------ @35 ots-lin ft. <br />15945 sq-ft.of sidewalk---------------------------- @14 ets.sq-ft- <br />680 lin ft of 6" sewer pipe---------------------- @45 cts.lin ft. <br />N ,k <br />995 lin ft of 8" " if ---------------------- @55 0ts.lin ft - <br />1490 lin ft of 4" sewer pipe--------------------- @40 lin ft - <br />14 6,,x 4",wyes-------------------------------- @$I.00 each. <br />' I <br />21 8"X 4" wyes----------------------------- --@ $I.00 each. <br />6 brick manholes and covers------------------- @040.00 each <br />A.Hess & Company. <br />5020 ou yds.excav,---------------------------- <br />-- @ 24 ots.cu.-yds. <br />80 cu yds fill-------------------------------- @ 24 " cu -ft. <br />71050 sq.ft.macadamizing------------------------- @ 07 if sq.ft- <br />71050 ft.of oiling------------------------------- @.9225-cte.sq.ft. <br />3275 lin ft-con.curb---------------------------- @ 320ts-lin-ft. <br />15945 sq.ft.of sidewalk------------- @ .10,7/8 cts.-sq-ft. <br />}i 689 lin.ft-of 6" sewer pipe-------------------- @ 42ata-lin.ft. <br />i <br />' 995 lin ft.of 8" 11 ------------------- @ 50 ets-lin ft- <br />1400 lin ft -of 4" " "------------------- @ 32 ots.lin ft. <br />�4 611x4,, wyes------------------------------- @40 ets.eaoh. <br />21 8„x4" "------------------------------- o ots.each <br />brick manholes and covers------------------ 37.00 each. <br />