Laserfiche WebLink
a <br />lying easterly from Redwood avenue and 12 feet southerly therefrom. 249 <br />That 8 inch by ¢ inch vitrified salt glazed tile pipe wyes, and ¢ inch vitrified salt <br />glazed tile pipe sewer latterals be constructed on Redwood avenue from the southerly line <br />of Ebener street to the southerly line of Sequoia avenue extended easterly where ever <br />neceaasary to connect with main sewer to be constructed thereon as hereinbefore setfnr.th, <br />said latterals to extend from main sewer to property lines on both sides of the street. <br />That 6 inch by 4. inch vitrified salt glazed tile pipe wyes and ¢ inch vitrified salt <br />glazed tile pipe sewer latterals be constructed on Sequoia street and Sequoia avenue from <br />the westerly line of Redwood avenue to the easterly line of Roosevelt avenue where ever <br />necessary to connect with main sewers to be constructed thereon as hereinbefore setforth, <br />said latterals to extend from main sewers to property lines on both sides of said Sequoia <br />�e��a/titiola <br />street and Sequoia avenue. Crderin <br />`Play s• <br />That one concrete pier with fittings be constructed on the line of said sewer on Sec+IGA�/ohS <br />Redwood avenue where same crosses the creek between Johnson street and Gordan street to T�edq'ood <br />• {kve <br />support the 8 inch wrought iron pipe hereinbefore mentioned. <br />That Redwood avenue be improved by having constructed thereon on both sides of the <br />street and 20 feet.from the center line• thereof,ceme4t curbs,from the southerly line of <br />Ebener street to the southerly line of Sequoia avenue extended easterly,excepting how- <br />ever the curbing on the::easterly side of Redwood avenue from the northerly side of the <br />bridge on said Redwood avenue between Johnson street and Gordan street and the northerly <br />line of Hordan•street, and also excepting any of $aid work already done upon said Redwood <br />avenue to the official grdde,also excepting bridge on Redwood avehue between Johnson stred; <br />and Gordan street. <br />That the intersections and terminations of all streets and avenues intersecting or. <br />-terminating at Redwood avenue between the southerly line of Ebener street and the south- <br />erly line of Sequoia avenue extended easterly shall be improved by having constructed upon <br />the respective corners thereof cementcurbing.Said cement curbing shall be constructed on <br />�Y said corners with a raduis of eight feet and both ends thereof at the property.lines <br />extended shall be a distance of I0 feet from said property lines,excepting however any of <br />said work already done to the' -official grade,excepting also the southeast and the north- <br />east corners of Gordan street and Redwood avenue. <br />That Sequoia street•be improved by having constructed thereon on both sides of the street <br />and 15 feet from the center line,thereof,cement curbs,from the easterly encl•of said <br />Sequoia street at the easterly limits of said Town to the easterly line of Redwood avenue,• <br />excepting the bridge on said Sequoia street, and also excepting any of 'said work already <br />done upon said Sequoia street to the official grade. <br />That Redwood avenue be improved by heitg;graded for the full width of the roadway there- <br />of and being,paved for the full width of said roadway from the southerly line of Ebener <br />street to the southerly line of Sequoia avenue extended easterly with crushed rock,rock <br />screenings and asphaltic bi,l,incl-uding all street intersections and all street termination5 <br />and alley terminations,excepting however from said grading and paving a strip on the <br />easterly side of said Redwood avenue imrhediately adjacent to the easterly curb line 8 feet <br />t in width and beginning at the northerly side of the bridge on said Redwood avenue between <br />' Johnson street and Gordan street and running southerly to the southerly line,of Gordan <br />street,and also excepting the bridge on said Redwood avenue between Johnson street and <br />a <br />Gordan street. <br />That Sequoia str et be improved by being graded for the full width of the roadway there- <br />of and being paved for the full width of the roadway thereof from the easterly limits of <br />the Town'of Redwood City to the easterly line of Redwood avenue,with crushed rock,rock <br />screenings and asphaltic oil,excluding the bridge on said Sequoid street. <br />That Sequoia'avenue be improved by being graded for the full width of the roadway <br />thereof and being paved for the full width of the roadway thereof from the westerly line <br />