Laserfiche WebLink
250 <br />of Roosevelt avenue with crushed rock,rock screenings and asphaltic oil,including all street <br />intersections. <br />That a timber bridge with timber bulkheads be constructed on Redwood avenue across the <br />creek between Johnson street, and Gordan street, said bridge to be 70 feet 4 inches long <br />,measured along the center line with a span of 16 feet. <br />That a bridge with concrete abutments and wooden floor,50 feet• long and with a span of <br />;16 feet be constructed on Sequoia street across the creek at a point 70 feet easterly from <br />the easterly line of Redwood avenue. <br />Passed and adopted by the Board of Trustees of the Town of Redwoid City at a regular <br />meeting of said Board held on the 16th.day of April,1917,by the following vote; <br />yes and in favor of the passage of the foregoing Resolution,Trustees, <br />eo.A.Merrill,Geo.W.Mc.Nulty,Carl X.Mabie,H.C.Tuchsen,E.H.Sampson. <br />oes an d against the passage of the forego ing Resolution,TrAstees, <br />one. <br />sent,Trustees,None. <br />-----•---------•----- --- E.H.Sampson. <br />President of the Board of Trustees of the <br />Town of Redwoid City. <br />Attest.W.A.Price. <br />Uerk of the Town of-R@dwood City. <br />I hereby approve the foregoing Resolution this 16th.day of Apr'il,1917, <br />E.H.Sampson. <br />President of the Board of Trustees of the <br />Town of Redwood (pity. <br />City Engineer submits plans and specifications. <br />8 f� <br />Trustee Tuchsen presents the following Resolution and moved its adoptiong Trustee Merrill <br />econds the motion. <br />RESOLUTION ADOPTING PLANS AND SPECIFICATIONS. <br />RESOLVED, that the plans and specifications for doing the hereinafter described work and <br />the hereinafter described improvements in the Town of Redwood City,County of San Mateo <br />Aesa/uf' State of California,to-wit; <br />,4 do tih <br />That an eight inch vitrified salt glazed the pipe sewer be constructed along the eahter <br />�jeai �e Mohs <br />line of Redwood avenue Brom the center line of Ebener street, and connecting with existing <br />Aealrroad ! vQ <br />manhole at said point, and continuing southerly along the center line of Redwood avenue to <br />the southerly line of Sequoia avenue,ext'ended east erlyg excepting hoaiaver a distance of 48 <br />feet where said sewer crosses the creek on said Redwood avenue between Johnson street and <br />Gordan street,said 48 feet to be constructed of eight inch wrough iron pipe. <br />That a six inch vitrified salt glazed tile pipe sewer be constructed along the center line ' <br />of Sequoia street in the Town of Redwood City from the easterly limits of the Town of -Redwood <br />City to the center line of Redwood avenue and connecting with manhole at said point, exdepting <br />however a distance of 26 feet where said sewer crosses the creek on•said Sequoia street,said ' <br />26 feet to be constructed of six inch•wrough iron pipe. <br />That a six inch vitrified salt glazed the pipe sewer be constructed along the center <br />line of Sequoia avenue extended at center line of Redwood avenueand connecting with manhole <br />at said point and continuing along the center line of Sequoia avenue and•connecting with <br />existing manhole at the extension off said line of -Sequoia avenue at center line of Roosevelt <br />avenue. <br />That brick manholes with cast iron frames and covers be constructed at the following <br />places,to-wit; <br />One manhole at center line of Redwood avenue at a point 20I.13 feet southerly from the <br />center line of Ebener street;one manhole at center line of Redwood avenue at extension of <br />I <br />