Laserfiche WebLink
I <br />Redwood City,May 5th.192498 o'clock P.M. <br />Regular meeting of the Board of Town Trustees held. <br />Upon roll call there were present Trustees; -President H.A.Beeger,C.K.Mabie;,A.E.Ilonteith, <br />G.W.MeNulty,M.E.Ryan,City Clerk W.A.Price. <br />Minutes of meeting held April 2Ist, and April 28th.1924 were read and on motion of <br />Trustee Mabie,seconded by Trustee Monteith and carried same be approved as read. <br />Affidavit of Jas.D.Hedge in the matter of Publishing notice to bidders ,was on motion <br />I ' of grustee Mabie,seeonded by Trustee Monteithsamebe received and filed.Motion Carried. <br />BORING ONE DEEP WELT,. <br />?, The following bids were opened,examined and declared to wit;; <br />k . <br />Board of Trustees, <br />Town of Redwood City,California. <br />N In compliance with the annexed notice inviting sealed proposals,I hereby propose and agree <br />to per#otm the work therein described,in accordance with the speciffications attached hereto <br />and execute the contract under the supervision and to the satififaotion of the Superinten- <br />dent of water,Town of Redwood City,at the following prioes,to-wit;- <br />j (I) For drilling a sixteen (16) inch hole to a depth of eighty (80) feet,setting sixteen <br />(Ib) inch casing and then continuing with a ten(IO) inch hole from the bottom of the six- <br />teen(16) inch hole to a depth of two hundred (200) feet setting the ten(IO) inch casing, <br />and cementing up between the ten(IO) inch and sixteen(B) inch casing in such manner as to <br />guarantee that all surface water pn the outside of the sixteen(i6) inch well can not #et <br />through into the tenXIO) inch well the sum of Five Hundred ($500.00)Dollars. <br />(2) For continuing with the ten(IO) inch hole from the -Two hundred (200) feet level to <br />two hundred and fifty(250) feet level, the sum of One huhdred and fifty($ 150.00)Dollars <br />per lineal foot. <br />Two hundred and fifty(250� feet level to the three hundred (300) feet level, the sum of <br />One hundred and seventy '( 175,00)Dollars per lineal foot, <br />Three hundred (300) feet letel to the three hundred and (fifty (350) feet level, the sum of <br />Tway Hundred(4@200.00)D61lars per lineal foot. <br />Three hundred and fifty(350) feet level to the four hundred and fifty(450) foot level,th e <br />LL sum of Five hundred and twenty five (0525-00)Dollars per lineal foot.. <br />• (3) In the event that I should be awarded the contract,I hereby agree to start work on the <br />iii well within 3odays from the date of said award, t.nd guarantee to work at -least eight(8) <br />hours ,)er day on each and every day thereafter until the well is completed,- excepting <br />Sunday's,legal holidays,and days that weather will not permit the operation of the tools. <br />(4) I propose to secure the casing together by -pecked set rivetted welded(Yes. <br />Name of Bidder John Damby, <br />f <br />Business Address R.F.D.Box 12,Palo Alto, <br />(Ii- For drilling a sixteen(16) inch hole to a depth of eighty(80) feet,setting the sixteen <br />(I ) inch casing, and then continuing with a ten (I0) inch hole from the bottom of the <br />sixteen(16)'inch hole to a depth of two hundred (200) feet,setting the ten(IO) inch casing, <br />' and cementing up bwtween the ten(IO) inch and sixteen(16) inch easing in such a manner as <br />to guarantee that all surface water on the outrside of the sixteen(Ib) inch well can not <br />get through into the ten(IO) inch well the sum of Seven Hundred and Five 80/I00($795.80/I00 <br />Dollars. <br />(2)- For continuing with the ten XIO) inch hole from the Two hundred (200) foot level to <br />two hundred and fifty(250) foot level, the sum of Three and 650ts.per ft -00 3.65). <br />Two hundred and fifty (250) feet letel to the three hundred (300) foot', level, the sum of <br />' Four Dollars and twenty five cents($4.25 ) per lineal foot. <br />Three hundred (300) feet level to the three hundred and difty (350) feet level, the sum of <br />Four dollars and ninty five cents($ 4.95) per lineal foot, <br />Three Hundred and fifty(350) foot level'.to the four hundred and fifty (450) feet level, the <br />sum of Five Dollars and sixty Five cents($ 5.65)- <br />(3) In the event that I should be awarded the contract,I hereby agree to start work on the <br />well within a reasonable time from the date of said award, and guarantee to work at least <br />eight(8) hours per day on.each•and every days thereafter until the well is completed.-ex- <br />cepting'Sundays,degal holidays,and days that weather will not permit the operation of the <br />tools. <br />(4) I propose to secure the casing together by pecked set rivettedv' elded,By Rivetts. <br />Name of Bidder,J.M.Bankhead & Son, <br />Business Address,886 29th:St.Oakland, <br />207 <br />