Laserfiche WebLink
'r r <br />xtte t, Y, Price <br />- <br />Clerk of the Town of Redwood Cit;,*. <br />I hereby t-pprove the lorae:oing Resolution this 6th d,q of ri1, 1W5 - <br />i30 0 --, 6 T. <br />W5- <br />i3eo--,er. <br />President o= the 3ol:rd of Trustees of the <br />Town of 3ed7rood City. <br />Dnmineer �;resont F1uns and �7a©cific�tions. <br />"ruotee RY,',_i .biers the Jllovlini: Resolution .wnd ­,oves its a ption, Trustee L'o:4-ul,ty <br />seconds the otion. ;._otion curried. <br />�7..L��iUi . DUPTli s PLn1,9 'i;D a3P;Ct.'.LC_:yiijllS 1�U. H - [j <br />ita�ULT_SD, b,, the Lo -.3:d oi"rustees of the 5Oo m of Red,;rood Cit,,,Cotulty of Sl -n ,,:...teo,Stt.te <br />0i li• li-Loriii,,, tit. t t.,e !il no, a.,oiil.et.) .,nd si)eciiic tions �_ <br />�or during tt10 iollo,,,,ring i70]k <br />fid :ins ti.e iollm,-,ing ii,prove: enta ill said Tomi of i,~edwood Cit�Y, to -grit; <br />That the roadway of El Camino Real <br />from the northwesterly line of Finger <br />avenue extended northeasterly in a <br />straight line across said El Camino <br />Real, southeasterly to the southeasterly <br />limits of the Town of Redwood City, <br />Including all street, avenue and al- <br />ley Intersections and terminations and <br />portions thereof, be graded and paved <br />with a Portland cement concrete pave- <br />ment, five (5) Inches thick, which pave- <br />ment shn'11 be laid and constructed ac- <br />cording to the Vlbrolithie method; <br />there is excepted, however, from the <br />foregoing described work a strip of <br />said roadway twenty-four (24) feet In <br />width and lying twelve (12) feet on <br />each side of the center line thereof, and <br />extending from said northwesterly line <br />of Finger avenue extended northeast- <br />erly across said El Camino Real in a <br />straight line, southeasterly to the <br />southeasterly limits of said Town of <br />Redwood City, said twenty-four (24) <br />foot strip being already paved; there, <br />Is also excepted, however, from the <br />foregoing described work, all that por- <br />tion 'of the roadway of El Camino <br />Real between Claremont avenup and <br />the center line of Rogers street extend- <br />ed southwesterly in a straight line <br />across El Camino Real, name being now <br />paved; there Is also excepted, however. <br />from the foregoing described work on <br />EI Camino Real all that portion there- <br />of from the northerly line of Broad- <br />way southeasterly along E1 Camino <br />Real for a distrance of 150 feet and all <br />on the northeasterly side of the center <br />line of said El Camino Real; there Is also <br />excepted, from the foregoing described <br />work on Ml Camino Real and on the <br />following terminations all the portion <br />of said terminations occupied by wood- <br />en bridges, to,wit: termination of Lin- <br />coln avenue and EI Camino Real, term- <br />ination of Roosevelt avenue and EI Ca- <br />mino Real, termination of Oak avenue <br />,and E1 Camino Real, and the termina- <br />tion of Redwood avenue and EI Camino <br />Real; there Is also excepted from the <br />foregoing described work on EI Camino <br />Real, a strip eight (8) Inches wide and <br />Immediately adjacent to the concrete <br />retaining wall constructed on the <br />southwesterly side of EI Camino Real <br />along the creek or ditch and extending <br />from a point 240 feet southeasterly from <br />the southeasterly line of Vern avenue <br />to the southeasterly limits of the Town <br />of Redwood City; provided said 8. Inch <br />exception shall not be omitted across <br />terminations of Lincoln, Roosevelt, Oak <br />and Redwood avenues; there is also ex- <br />cepted, from the foregoing described <br />work on EI Camino Real the two con- <br />creto bridges across El Camino Real at <br />the following places, to -wit: one such <br />bridge on said E1 Camino Real be- <br />tween James avenue and Harrison av- <br />tending from intersection of southwest -•easterly line of El Camino Real north- <br />erly line of El Camino Real with easterly for a distance of 10 feet. <br />southeasterly curb line of' Brewster A gutter 6 Inches thick and 30 Inches <br />avenue to Intersection of southwester- wide Immediately adjacent to the <br />ly curb line of EI Camino Real and northwesterly curb line of Cedar street <br />southeasterly line of Brewster avenue, and extending from the northeasterly <br />A 4% Inch by 4015 Inch corrugated line of EI Camino Real northeasterly <br />Iron arch culvert with concrete top and for a distance of 10 feet.- <br />base <br />eet:base across Broadway 5 feet south- A gutter 6 Inches thick and 30 Inches <br />westerly from and parallel to the wide Immediately adjacent to the <br />southwesterly curb line of El Camino southeasterly curb line of'Cedar street <br />Real and extending from a point 33 and extending from the northeasterly <br />feet northwesterly from the Internee- line of El Camino Rea! northeasterly <br />tion of the southwesterly curb line of for a distance of 10 feet. <br />El Camino Real with the northerly line A gutter 6 Inches thick and 30 Inches <br />of Broadway southeasterly 172 feet, wide Immediately adjacent to the <br />with one branch 4% Inches by 40% northwesterly curb line of Pine street <br />Inch corrugated Iron arch culvert 10 and extending from the northeasterly <br />fee: southeasterly from the southerly: line of EI Camino Real northeasterly <br />curb ling of Broadway and from center for a distance of 10 feet. <br />line of main culvert across Brondway A gutter 6 Inches thick and 30 Inches <br />westerly for a distance of 40 feet 10tH :ride Immediately adjacent to the <br />Inches, and with one branch 37-8 Inch .outheasterly curb line of Pine street <br />by 30 Inch corrugated Iron arch cul- and extending from the northeasterly <br />vert 3 feet 9 inches northwesterly from line of EI Camino Real northeasterly <br />the northerly curb line of Broadway for a distance of 10 feet. <br />and from center line of Main culvert And also that 17 feet of the existing <br />across Broadway westerly for a dis- curb be removed from the concrete <br />tance of 44 feet 1 Inch.bridge Berens E1 Camino Real between, <br />Vera and Lincoln avenues, said curb be - <br />arch <br />S1¢ Inch i 18 inch'Corrugatedtop <br />and aseron Ing on the northeasterly side of said <br />arch culvert with concrete top and base bridge, <br />3 Peet Inches northeasterly from and <br />parallell with the northeasterly curb <br />And also that 'cement concrete curb <br />line of EI Camnio Real and extending be constructed on the northeasterly <br />from the northwesterly line of Beech side of El Camino Real, said curb to be <br />street to the southeasterly line of 14 inches deep, 6 Inches across the top <br />Beech street, a length of 65 feet, with and 8 inches across the bottom, and ex - <br />two branches of same size culvert, tending from the angle point in the <br />one branch extending from the point concrete retaining wall on southeast-. <br />of Intersection of the northwesterly erly side of Maiple strbet on a radius of <br />line of Beech street and the northeast- 10 feet to northeasterly curb line of <br />erly curb line of El Camino Real to a EI Camino Real and continuing on <br />point on 'the northwesterly curb line northeasterly curb line of EI Camino <br />of Beech street 31¢ feet northeasterly Real to connect with curb now In, <br />from the northeasterly line th El Ca- place on northwesterly curb line of <br />mino Real, length 21 feet 5 Inches, and Beech street, provided, however, that <br />with one branch extending from a point°here said curb crosses the concrete <br />on the northeasterly curb line of EI bridge across EI Camino Real It shall <br />Camino Real 8 feet southeasterly from be 6 inches deep, 6 inches across the <br />the southeasterly line of Beech street top and 7 Inches across the bottom. <br />and to a point on the southeasterly And also that header boards consist -I <br />curb line of Beech street 21t2 feet north- Ing of two (2), 2 Inch by 6 Inch redwood <br />easterly from the northeasterly. line of Planks shall be Bet In place along El <br />EL Camino Retfl, length 19 feet 4% Camino Real six (6) Inches northeast - <br />Inches. erly from the concrete retaining wall <br />along the creek or ditch on the south - <br />A 3% inch by 18 Inch westerly side of EI Camino Real and <br />corrugated Iron arch culvert from a point 240 feet southeasterly <br />with concrete top and bane shall from the southeasterly line of Vera <br />be constructed across Cedar street and avenue to the southeasterly limits of <br />Pine street, which culverts shall be of the Town of Redwood City, excepting, <br />the same size and length and have the however, the terminations of Lincoln, <br />same branches as the culverts last Roosevelt, Oak and Redwood avenues. <br />herein described across Beech' street Referenee is hereby made to VIBRO- <br />and said culverts across Cedar street LITHIC CONCRETE PAVING AGREE -i <br />and Pine street shall have the -same MENT of the ,California 'Vlbrollthfe: <br />relative locations across said streets CotryPany, dated, Murch 26th, 1926, and. <br />athe culvert lastly herein described now on file In the office of the Clerk! <br />across <br />ross Beech street. of the Town of Redwood City. <br />enue, one one suun mage eeLween <br />That the ronowing storm water in - <br />Vera avenue and Lincoln avenue: there <br />lets be constructed and located an here - <br />is also excepted, from the foregoing <br />in described, said storm water Inlets <br />described work on EI Camino Real the <br />to consist of an 18 inch by 24 Inch' <br />termination of Main Street and El Ca- <br />cast Iron grating set In a cast Iron <br />mine Real. <br />frame and upon a cement concrete box. <br />And also that the following corru- <br />gated Iron arch culverts with cement <br />westerly curb line of El Camino Real <br />concrete tops and bases be construct- <br />at a Point III feet southeasterly from <br />ed at the following locations, to -wit: <br />the southeasterly line of James av- <br />A 31! Inch by 18 inch corrugated Iron <br />enue; one bnmedlately adjacent to <br />arch culvert 60 feet In length with con- <br />southwesterly each lino of EI Camino <br />erste top and base along the southwest- <br />trey curb El Camino from <br />Real at a point 201 feet southeasterly <br />AvonRealdale <br />Che northwesterly line of Avondale nv- <br />estine rl <br />from the southeasterly line of James <br />enue and extending across Avondale <br />avenue; one Immediately adjacent <br />avenue to the southeasterly line there- <br />to northeasterly curb line of EI Ca. <br />of, with "T" branches extending south- <br />mine Real at a point 181 feet south - <br />westerly down Avondale avenue ndjac- <br />easterly from the southeasterly line of <br />eat to the northwesterly and south- <br />,Tames avenue produced northeasterly <br />easterly curb lints thereof for n dis- <br />In a straight line across El Camino <br />tante of 11 feet, said " branches to <br />Real; one lormediately adjacent to the <br />be Inch 18 Inch corrugated Iron <br />northeasterly curb line of EI Camino <br />archh culvertt with concrete top and <br />Real at a point 201 feet southeasterly <br />from the soutbeasterly line of James <br />bast• <br />avenue produced northeasterly In a <br />A 4% Inch by 40% Inch corrugated <br />straight line across EI Camino Real; <br />Iron arch culvert 37 feet 41h Inches In <br />one Immediately adjacent -to south - <br />length with concrete top and base on the <br />westerly curb line of El Camino Real <br />southwesterly side of El Camino Real, <br />at a point 200 feet northwesterly from <br />with Intake through the southwesterly <br />the northwesterly., line of Yera avenue;' <br />curb line of El Camino Real, at a <br />one Immediately adjacent to northeast. <br />point 22 feet northwesterly from north- <br />erly curb line of El Camino Real at a <br />westerly line of Whipple avenue, and <br />point 335 feet southeasterly from the <br />also with Intake through the north- <br />southeasterly line of Diller street, <br />westerly curb line of Whipple avenue <br />said Inst two mentioned storm water <br />Immediately southwest and adjacent to <br />inlets to be connected with corrugated <br />southwesterly line of EI Camino Real, <br />iron culvert now In place by means of <br />main barrel of culvert to extend from a <br />a short length of 12 Inch corrugated <br />point 3 feet 9 inches southwesterly <br />Iron pipe; one Immediately adjacent to <br />from the southwesterly curb line of El <br />northeasterly curb line of EI Camino <br />Camino Real to a point on the south- <br />Real at a point 56 feet northwesterly <br />easterly curb line of Rogers street, ex- <br />from the northwesterly line of Beech <br />cepting therefrom all that portion of <br />street; the last mentioned storm, water <br />said culvert lying 12 feet on each side <br />inlet to be connected with concrete <br />of the center line of El Camino Real. <br />,bridge across EI Camino Real between <br />Total length of main barrel of culvert <br />Vera and Lincoln avenues. <br />to be 41 feet 411A Inches. <br />And also that cement concrete gut - <br />A 3 7-8 Inch by 30 Inch corrugated <br />ters be constructed on the following <br />Iron arch culvert with concrete top <br />streets and avenues at the following <br />and base immediately adjacent and <br />places, to -wit: <br />parallel with northwesterly curb line <br />A gutter 6 Inches thick and 211¢ <br />of Hopkins avenue and extending from <br />Camino <br />Inches wide Immediately adjacent to <br />southwesterly line of EI <br />Real to the northeasterly line of <br />northwesterly curb line of Avondale) <br />Camino Real n. distance of FG feet, withth <br />avenue from the southwesterly neof <br />•,—„ <br />EI Cnmin_o Real htv <br />Snutestecla­fnr <br />a <br />333 <br />