<br />That Maple Street from the edge.
<br />I" C11'.a: ZrYl
<br />curb and gutter to be six (6r
<br />hereof.
<br />of the existing pavement and gut
<br />crete curb to be built and con -
<br />i
<br />t
<br />i
<br />i
<br />col,T C:.1 Of
<br />-FOG,
<br />n1
<br />;'0 �':L.'7: Y.i'•;. '.'.'.
<br />'a rf�F..'3�.:'; .1'i ',^s
<br />- :T:.+^^l,i'j.r• I:•G7:u
<br />a
<br />_. -.,"i _.
<br />'0' 1"Ie :011cr.."
<br />.' ::O_'t
<br />10910•., i'..1,10 ,e1, .. '3
<br />°Yl ... ni- --a �G=:-j 4-:
<br />_
<br />That Maple Street from the edge.
<br />broken stone base and said con•
<br />curb and gutter to be six (6r
<br />hereof.
<br />of the existing pavement and gut
<br />crete curb to be built and con -
<br />inches across the top and twelve
<br />Reference is hereby made to
<br />ter on the production in astraight
<br />structed at the same time as the
<br />(12) inches deep and the gutter
<br />the patent license agreement of
<br />line of the westerly line of Main
<br />pavement. I
<br />portion of said cement concrete
<br />Concrete Curing Inc. dated the
<br />Street northerly across said Maple
<br />There is excepted from the
<br />combined curb and gutter to be
<br />2nd day of December, 1929, and
<br />Street southwesterly to the pro-
<br />above described hydraulic cement
<br />three (3) feet wide and to be six
<br />now on file in the office of the
<br />duction of the division line be.
<br />concrete, curbs all curb now in
<br />(6) inches thick next to the pave.
<br />Clerk of the City of Redwood City
<br />tween lots one (1) and two (2),
<br />place which has not been ordered
<br />ment and six (6) inches thick next
<br />and the same is made a part
<br />block six (6) Diller's Addition as
<br />removed herein and also there is
<br />to the curb and said cement con-
<br />hereof.
<br />shown on the map thereof record-
<br />excepted from the above described'
<br />crete combined curb and gutter
<br />ed In Book E 'of Maps at, page
<br />hydraulic cement concrete curb
<br />to be built and constructed at. one
<br />77, records of San Mateo County,
<br />the curb on both sides of Maple
<br />time so that there shall be no
<br />extended southeasterly across said
<br />Street between the northeasterly
<br />joint between the curb and gut -
<br />Maple Street, be improved as fol-
<br />and southwesterly right of way
<br />ter; provided, however, that said
<br />lows, to -wit:
<br />lines of the Southern Pacific Rail.
<br />cement concrete combined curb
<br />1. That the existing concrete
<br />road Company and there is also
<br />and gutter to be laid upon a base
<br />curb on the northwesterly side of
<br />excepted from the above described
<br />of broken stone three (3) inches
<br />Maple Street between the pro-
<br />hydraulic cement concrete curbs
<br />thick after rolling with a cushion
<br />duction northerly of the westerly
<br />the concrete bridge on Maple
<br />of sand one (1) inch thick be -
<br />line of Main Street across Maple
<br />Street between the Southern Pa-
<br />tween the broken stone base and
<br />Street southwesterly to the north-
<br />cific Railroad Company's right of
<br />the hydraulic cement concrete
<br />erly line of the right of way of
<br />way and Lathrop Street
<br />combined curb and gutter to be
<br />the Southern Pacific Railroad
<br />4. That hydraulic cement con-
<br />built as herein provided.
<br />Company and thirty-seven (37)
<br />crete sidewalks four (4) inches
<br />That Lathrop Street in the City
<br />linear feet of the existing concrete
<br />thick and five (5) feet in width be
<br />of Redwood City be Improved by
<br />curb at the southerly corner of
<br />constructed on the northwesterly
<br />having constructed therein one (1)
<br />the intersection of Main Street
<br />side of Maple Street between the
<br />hydraulic cement concrete storm
<br />with Maple Street and also that
<br />production in a straight line north-
<br />water inlet with cast iron frame
<br />eighteen (18) linear feet of the
<br />westerly of the end of the exist-
<br />and grating at the end of curb
<br />existing concrete curb on Maple
<br />ing gutter on Main Street south-
<br />return on the southwesterly side
<br />Street at the southerly corner of
<br />westerly to the northeasterly right
<br />of Lathrop Street at Maple Street;
<br />the termination of Lathrop Street
<br />of way line of the Southern Pa-
<br />said storm water inlet to be gro-
<br />at Maple Street be removed
<br />cific Railroad Company, and from
<br />vided with a twelve (12) inch con.
<br />- 2 -,'That Maple Street for the full
<br />the southwesterly right of way
<br />crete pipe drain thirty-two (32)
<br />width of the roadway and for the
<br />line of the Southern Pacific Rail-
<br />feet in length extending to the
<br />length hereinbefore described in-
<br />road Company to the existing side-
<br />creek,
<br />eluding all intersections, termina-
<br />walk at the northeasterly side of
<br />That Lathrop Street from the
<br />tions, opposite terminations or por-
<br />the concrete bridge on said Maple
<br />northwesterly line of the concrete
<br />tions thereof within the lines and
<br />Street between the Southern Pa-
<br />bridge between Elm Street and
<br />limits of Maple Street above de-
<br />cific Railroad Company's right
<br />Maple Street northwesterly to the
<br />scribed be graded and paved with
<br />of way line and Lathrop Street.
<br />production in a straight line of
<br />hydraulic cement concrete pave-
<br />and from the southwesterly edge
<br />the southeasterly curb line of Ma-
<br />ment' six (6) inches thick laid
<br />of the existing sidewalk at the
<br />ple Street northeasterly across said
<br />upon a base of broken stone three
<br />southwesterly line of said bridge
<br />Lathrop Street including the por-
<br />(3) Inches thick after rolling, with
<br />to the existing sidewalk at the
<br />tion of termination of Lathrop
<br />a cushion of sand one (1) inch
<br />production in a straight line of
<br />Street and Maple Street included
<br />thick laid between said broken
<br />the division line between lots one
<br />in the foregoing description, be
<br />stone base and said concrete pave-
<br />(1) and two (2), block 6, Diller's
<br />Improved as follows, to -wit:
<br />ment; provided, however, that said
<br />Addition hereinbefore referred to
<br />1. That Lathrop Street above
<br />concrete pavement shall have a
<br />nerein.
<br />mentioned for the full width of
<br />thickness of eight (8) inches along
<br />5. That two (2) hydraulic ce-
<br />the roadway thereof and for the
<br />the centerline of said Maple Street
<br />went concrete storm water'inlets
<br />length herein provided be graded
<br />and taper to a thickness of six (6)
<br />with cast Iron frames and grat-
<br />and paved with a hydraulic ce-
<br />inches at points three (3) feet on
<br />Ings be constructed, one (1) on
<br />ment concrete pavement six (6)
<br />each side of said centerline.
<br />each side of Maple Street at the
<br />Inches thick laid upon a base of
<br />There is excepted from the
<br />southerly end of the hydraulic ce-
<br />broken stone three (3) inches
<br />above described pavement all that
<br />ment concrete pavement herein or-
<br />thick after rolling with a cushion
<br />portion of Maple Street lying be-
<br />dered constructed on said Maple
<br />of sand one (1) inch thick laid
<br />tween a line two (2) feet north-
<br />Street; said storm water Inlets
<br />between said broken stone base
<br />easterly from and parallel to the
<br />to be provided with a twelve (12)
<br />and said concrete pavement; pro -
<br />northeasterly rail of the Southern
<br />Inch concrete pipe drain forty
<br />vided, however, that said concrete
<br />Pacific Railroad Company's tracks:
<br />eight (48) feet in length, connect
<br />pavement shall have a thickness
<br />sand a line two (2) feet south-
<br />Ing said -Inlets and to extend to
<br />of eight (8) inches along the can -
<br />westerly from and parallel to the
<br />the creek.
<br />terline of the roadway of said
<br />most southwesterly rail of the
<br />6. That the area of the concrete
<br />Lathrop Street and taper to a
<br />Southern Pacific Railroad Com-
<br />bridge on Maple Street, between
<br />thickness , of. six '(6) inches at
<br />pany's tracks; also there is ex-
<br />the Southern Pacific Railroad
<br />points three (3) feet on each
<br />cepted from the above described
<br />Company's right of way and Lath
<br />side of said centerline.
<br />pavement the area included be-
<br />rop Street and between the edges
<br />2. That hydraulic cement con.
<br />tween the northeasterly and south-
<br />of gutters on said bridge be paved
<br />crete curbs integral with pave.
<br />westerly lines of the concrete
<br />with an asphaltic concrete pave.
<br />ment six (6) inches across the
<br />bridge on Maple Street between
<br />ment five (5) inches thick at the
<br />top and twelve (12) inches deep
<br />the Southern Pacific Railroad
<br />centerline of street, and taperlm,
<br />be constructed on both sides of the -
<br />Company's right of way and Lath.
<br />to a thickness of two (2) inches
<br />hereinabove described portion of
<br />rop Street.
<br />at edges of gutters.
<br />Lathrop Street including all cor-
<br />3. That hydraulic cement con-
<br />That Maple Street in the City
<br />ners of intersections or termina-
<br />crete curbs integral with thepave-
<br />of Redwood City be improved b}
<br />tions; said hydraulic cement con-
<br />ment and six (6) inches across the
<br />having constructed thereon on the
<br />crete curbs to be laid upon a
<br />top and twelve (12) inches deep ba
<br />southeasterly sloe thereof From
<br />base of broken stone three (3)
<br />constructed on both sides of Ma-
<br />the production in a straight line
<br />inches thick after rolling with
<br />ple Street hereinbefore described
<br />of the southeasterly curb line of
<br />a cushion of sand one (1) inch
<br />including all corners of Intersec-
<br />said Maple Street northeasterly
<br />thick laid between the broken
<br />tions, terminations or opposite ter.
<br />across Lathrop Street and the
<br />stone base and said concrete
<br />minations or portions thereof with-
<br />prediction of the dividing line be
<br />curbs,
<br />In the lines and limits of Maple
<br />)ween lots one and two, bloel; d
<br />Reference is hereby made to the
<br />Street as above described; said
<br />Diller's Addition hereinbefore men
<br />patent license agreement of Me -
<br />hydraulic cement concrete curbs
<br />tioned extended southeasteriv
<br />Everlast, Incorporated, dated the
<br />to be laid upon a base of broken
<br />across said Maple Street, a by
<br />12th day of October, 1928, and
<br />stone three (3) inches thick after
<br />drat lie cement concrete combiner)
<br />now on file in the office of the
<br />rolling with a. cushion of sand one
<br />r-nrb and gutter, the curb portion
<br />Clerk of the City of Redwood
<br />(1) inch thick laid between said
<br />of said cement concrete combined
<br />City, and the same Is made a part
<br />i
<br />t
<br />i
<br />i
<br />
|