|
a`ngl'e`ot-68'"'18�`to fife centerline` we9tealy 'from -'the sont6eaeterly` street and also one (1) cast Iron
<br />on the 21st day of July, 1930, and
<br />thereof and the centerline of said
<br />line of Madison Avenue; thence
<br />pipe six (6) Inches in diameter and
<br />now on file In the office of the
<br />culvert to be on the production
<br />on, a line distant five (5) feet
<br />twelve (12) feet In length be pro-
<br />Clerk of said City, to which -plane,,
<br />in a straight line westerly of the
<br />northwesterly and parallel to the
<br />vided and placed at the sewer
<br />profiles, detailed drawings and;
<br />centerline of the easement through
<br />southeasterly line of Madison Ave-
<br />crossing under the culvert on Ne-
<br />specifications reference is hereby;
<br />Block 8, New High School Acres;
<br />nue to the southwesterly curb line
<br />vada Street
<br />made for a complete description;
<br />said abovementioned four (4) foot
<br />of Nevada Street; thence on a
<br />g•. That four (4), four (4)' Inch
<br />and location of said work and im-
<br />by five (5) foot reinforced ce-
<br />curve -across Nevada Street to a
<br />vitrified salt glazed tile pipe sewer
<br />provements and for further par -
<br />Went concrete box culvert to be
<br />point distant five (5) feet south-
<br />laterals be constructed from the
<br />titulars, and the same are made
<br />paved with an asphaltic �conerete
<br />westerly from the northeasterly
<br />main sewer now in place along the
<br />a part hereof.
<br />pavement - six (6) inches thick at the
<br />line of Nevada Street; thence on
<br />.centerline of QuartzStreet said
<br />And the Council, of the City of
<br />centerline thereof and one and
<br />a line distant five (5) feet south-
<br />four (4) laterals to extend from
<br />Redwood City does hereby determ-
<br />one-quarter (11/4) Inch thick at the
<br />westerly from the northeasterly
<br />the main sewer to the northeaster-
<br />ine and declare that the foregoing
<br />gutter lines, as more fully shown,
<br />line of Nevada Street to the south-
<br />ly property line of Quartz Street;
<br />described work and improvements
<br />on the plans, profiles, sections, de-
<br />easterly line of Vera Avenue, said
<br />that twelve (12), (4) inch
<br />are of more than local or ordinary
<br />tailed drawings and specifications
<br />four (4) foot by' five 0) foot box
<br />,four
<br />vitrified salt glazed file pipe sewer
<br />public benefit and will affect and
<br />referred to herein, and that two
<br />storm water culvert to be carried
<br />laterals be constructed from the
<br />benefit - the lands, and district
<br />(2)' reinforced cement concrete
<br />across all Intersecting streets on
<br />main sewer now in place along
<br />hereinafter mentioned, which said
<br />-storm water inlets with cast iron
<br />the lines hereinabove described;
<br />the centerline of Madison Avenue,
<br />district is hereby declared to
<br />frames and gratings and twelve
<br />said above mentioned storm water
<br />said twelve (12) four (4) inch
<br />,he
<br />the district benefited by said work
<br />(12) inch circular cement con-
<br />culvert to be provided with seven
<br />vitrified salt glazed tile pipe sewer
<br />and mprovementa; that therefore
<br />trete drain pipgs four (4) feet
<br />(7) manholes capped with cast
<br />be constructed from the
<br />the entire costs and expenses of
<br />_ in length be placed in the gutters
<br />iron - frames and covers, in the
<br />-laterals
<br />main sewer now in place along the
<br />said work and improvements shall
<br />on the northwesterly side of the
<br />reinforced cement- concrete four
<br />locations and of the dimenslons
<br />as shown on the plane, profiles, de-
<br />centerline of Madison Avenue, said
<br />be and are hereby made charge -
<br />(4) foot by five (5), foot box cul-
<br />tailed drawings and 'specifications;
<br />twelve 512) laterals to extend from
<br />able against and shall be assessed
<br />vert' and connected thereto, or-
<br />twelve (12) inch cement concrete
<br />the main sewer to the southeaster-
<br />Ave-
<br />upon said lands and dlstriet
<br />which district Is within the ]lm-_
<br />dered hereinabove to be built on
<br />circular storm water pipe culverts
<br />ly property line of Madison
<br />its- of the City of Redwood City,
<br />Ruby - Street further that Ruby
<br />provided. with reinforced cement
<br />nue. That four (4), four (4) inch
<br />County of San Mateo, State of
<br />Street between the edges of the
<br />concrete storm water inlets and
<br />vitrified salt glazed the pipe sewer
<br />California, and said district is de-;
<br />existing pavement between the
<br />capped with cast Iron frames and
<br />laterals be constructed from the
<br />scribed and
<br />northerly and southerly lines of
<br />eratings to be built at the loca-.main
<br />sewer now in place along
<br />shown on a certain:
<br />map or plat entitled "Map Show-.
<br />the easements tbroueh Blocks 8
<br />tions indicated as follows: One
<br />'twelve,
<br />the centerline of Nevada Street,
<br />Assessment District under-
<br />and 9, New High School Acres,
<br />such (12) Inch culvert to
<br />said four (4) laterals to extend
<br />,Ing
<br />of Intention, No. M-12,"
<br />produced across Ruby .Street and
<br />be built at the northwesterly curb
<br />from the main sewer to the north -
<br />which map or was adopted
<br />between the northwesterly and
<br />line of Jefferson Avenue and con-
<br />easterly property line of Nevada
<br />plat .
<br />and
<br />and the Council of
<br />of
<br />southeasterly edges the four
<br />neet to the four (4) foot by five
<br />Street. All of ,the above men-
<br />Citappy
<br />Red
<br />the City of Redwood- City on the
<br />(4) foot by five (5) foot rein-
<br />(5) foot box culvert; One such
<br />tioned four (4) inch laterals to be
<br />day, July, 1930, and which
<br />forced cement concrete box cul-
<br />twelve (12) Inch culvert to ,be
<br />connected to their respective main
<br />map la
<br />map or plat is low on file is the
<br />vert herein ordered to be built on
<br />built at the southeasterly property
<br />sewers at the wyes from which
<br />office of the Clerk of said City
<br />a
<br />Ruby Street be •paved with an
<br />line of Jefferson Avenue and con-
<br />the existinglaterals at these loca-
<br />Redwood and which
<br />asphaltic concrete pavement two
<br />nett to the four (4) foot by five
<br />tof
<br />tions are to be removed.
<br />reteCity,
<br />map or plat reference is hereby
<br />is
<br />and one-half (2%) inches in thick-
<br />(5) foot, box culvert; One such
<br />There is however excepted :from
<br />made for an accurate and com-
<br />ness with an asphaltic concrete
<br />twelve (12) inch culvert to be
<br />the cement concrete pavement and
<br />plete description and location 61
<br />wearing surface one and* one-half
<br />built ate the northwesterly prop-
<br />integral curb ordered
<br />said assessment district and the
<br />0 %) inches in thickness laid there-
<br />erty line o1 Madison Avenue across
<br />,hereinbefore
<br />to be built on Ramona Avenue
<br />same hP made a part hereof; pro..
<br />on, provided said asphaltic ,con-
<br />Quartz Street; One such twelve
<br />twelve (12) feet at the location
<br />vided, however, that all streets
<br />trete pavement be laid upon a base
<br />(12) inch culvert to be built at
<br />of the bridge to be built thereon
<br />and avenues or portions thereof
<br />or cushion of broken stone three
<br />the southwesterly property line
<br />as more, fully shown on the plans,
<br />included within said assessment
<br />(3) inches in thickness after roll-
<br />of Pearl, Opal and Nevada Streets
<br />Profiles, detailed drawings and
<br />district and shown on the map
<br />Ing, also that cement concrete com-
<br />across Madison Avenue , and con-
<br />specifications.
<br />thereof shall be omitted from any -
<br />bind curb and gutter be built
<br />(from the the
<br />nett to the four (4) foot by five
<br />built
<br />The City will pay out of its 1930
<br />assessment levied for the costs and
<br />ends of exiating
<br />cement concrete combined curb
<br />cement
<br />(5) foot box culvert to be
<br />on the southeasterly side of Madi-
<br />bond fund the sum of Seven Thou-
<br />expenses of the - work aforesaid,
<br />Bald streets and avenues and por-
<br />and now In place) between
<br />Avenue as herein ordered to
<br />sand ($7,000) Dollars towards the
<br />tions thereof now being in public
<br />the northerly and southerly lines
<br />be built -
<br />costs of the improvements -de-
<br />use as public streets and avenues
<br />the easement through Blocks 8
<br />5. That the timber bridge- on,
<br />scribed herein is paragraphs num-
<br />There is hereby excepted from,
<br />and 9, New High y4chool Acres,
<br />Jefferson Avenue lying twenty-five
<br />bered 3, 4, 5, 6, 7, and 8.
<br />the work and improvements afrom
<br />produced across Ruby Street the
<br />(25) feet northeasterly from. the
<br />The width of the streets and
<br />said any thereof that is already_
<br />curb portion of said cement con-
<br />northeasterly property line of
<br />avenues hereinbefore mentioned,
<br />done to the -lines andas
<br />grades
<br />trete combined curb and gutter to
<br />Quartz Street be removed and the
<br />and the width of the roadways o1
<br />e -
<br />tiled oa the plane, profiles, de -
<br />be six (8), inches across the top
<br />'inches
<br />opening filled in, and a cement
<br />said streetsandavenues, and the
<br />tailed drawings and specifications
<br />and eleven (11) deep and
<br />pavement with integral
<br />width of the sidewalks of said
<br />herein referred to.
<br />the gutter portion of said cement
<br />concrete
<br />to match that already in
<br />streets and avenues are to be
<br />NOTICE IS HEREBY GIVEN
<br />concrete combined curb andtter
<br />to be twenty-four wide
<br />curb
<br />on both sides of the timber
<br />and are as shown on the Plana,
<br />that aerial bonds to represent un -
<br />(24) inches
<br />place
<br />bridge be built of the thickness
<br />profiles and detailed drawings
<br />paid assessments and bear Interest
<br />and to be six and one-quarter
<br />Inches thick to
<br />and nature of the existing pave-
<br />hereinafter referred to herein.
<br />at the rate of seven (7) per cent 11!
<br />(8) next" the
<br />pavement
<br />pavement and five (5) inches thick'
<br />ment and curb and all as shown
<br />That the official elevation for
<br />issued here -
<br />per annum ems
<br />next to the curb, said cement con_
<br />on plana, profiles and detailed
<br />the street grades of said streets
<br />under a
<br />the manner provided by -
<br />trete 'combined curb and gutter
<br />drawings referred to herein; also
<br />and avenues hereinbefore men-
<br />the Improvement Bond Act
<br />pr
<br />to be laid upon a base or cushion
<br />that a strip of the existing cement
<br />ttoned, crown grades, curb grades
<br />of the State of .California, as:
<br />ia, as:
<br />of broken stone three (3) inches.
<br />concrete pavement twelve (12) feet
<br />and grade elevations for top of.
<br />amended, the last installment 01'
<br />In thickness after rolling.
<br />in width between aline distant
<br />gutters be, changed and grades dif-
<br />which bonds. shall mature- and be
<br />two (2) feet southwesterly from
<br />ferent from those established or
<br />'Payable nine (8) years from the'
<br />4. That a reinforced cement con-
<br />and parallel to the northeasterly
<br />adopted prior to the adoption by
<br />second day of July next succeed-.
<br />Crete four (4) foot by five (5)
<br />curb line of Quartz Street and a
<br />the Council of the Cit of Red-
<br />Y
<br />Ing ten (10) months from their
<br />foot box storm water culvert with
<br />lino twelve (12)' feet northeasterly
<br />wood City of the plane, profiles,
<br />date. Except as herein provided
<br />manholes capped with cast iron
<br />therefrom be removed to build the
<br />detailed drawings and specifics-
<br />for -the Issuance of serial bdnds
<br />frames and covers and. reinforced'
<br />four (4) foot by five (5) foot box
<br />tido hereinafter referred to herein
<br />the work and improvements Ler¢-1
<br />in described
<br />cement concrete storm water in-
<br />culvert, said pavement to be re-
<br />shall be adopted, and such official
<br />different
<br />shall be done anal
<br />made pursuant to the
<br />lets, capped with cast iron frames
<br />Placed upon the completion of the
<br />and and prior grades
<br />shall be modified and are hereby
<br />provisions
<br />of the "Improvement Act of 1911"
<br />and gra(12) and provided with
<br />culvert.
<br />8. That a channel of the section
<br />modified and changed- that the
<br />of the State of California,as
<br />twelve (12) Inch circular pipe
<br />and dimensions shown on the plana
<br />Official grades shall be and con -
<br />'
<br />amended and now In effect.
<br />AND NOTICE
<br />storm water drains ofr the sizes,
<br />dimensions
<br />excavated through Block New
<br />form to the grades as shown on
<br />the
<br />IS HEREBY
<br />GIVEN that Monday, 'l
<br />Y, the lith d ay
<br />and number and is the
<br />locations and
<br />Hi
<br />High School Acres within the linea
<br />a
<br />plans, profiles and detailed.
<br />drawings for
<br />of August, 1930, at the hour o1 1D,
<br />particular positions
<br />and of the materials ed are more
<br />of the right of way, through said
<br />g
<br />said work and m-
<br />provements, which lana
<br />plans, profiles
<br />,
<br />oolock a. m. said day, to tLe
<br />fully shown, . end set
<br />Block 8, New High School Acres;
<br />g
<br />and detailed' drawings were hereto-
<br />Council Clamber o1 the Council
<br />be
<br />las, pr e -
<br />forth on a the plan, profiles, de-
<br />the four (4) toot by five (5) foot
<br />tore adopted by the Council of the
<br />of the City of'Itedwood City In the
<br />felled drawings and' specification
<br />box storm, water culvert and all
<br />City of Redwood City on the 21st
<br />City Hall on Webster Street fII
<br />referred to herein, shall be con-
<br />storm water inlets are to be - re-
<br />1i
<br />day of July, 1930, by Resolution
<br />said City of -Redwood City County i
<br />strutted in, along and upon the
<br />inforced with steel as shown on
<br />Adopting Plana, Profiles and Speci-
<br />of San Mateo, State of California,
<br />following streets and avenues, to-
<br />the plane, profiles, detailed draw-
<br />Inge
<br />ficationa •No. M-12", which plane,
<br />Las ,been and is hereby flied as
<br />wit:. Said reinforced cement con-
<br />and specifications referred
<br />Profiles, detailed drawings andcret
<br />the day, hour and place when and
<br />foot
<br />fourbox
<br />to herein.
<br />specifications are now file
<br />where any and all persons having
<br />footestorm water4)
<br />culvert ulvert one
<br />7• That the existing sewers aloe t,
<br />on in
<br />the •office o1 the Clerk o! the City
<br />any objections -to the proposed
<br />thousand eight hundred' thirteen
<br />the centerlines of Rub
<br />°f Redwood City and to which
<br />work and Improvements described
<br />herein,
<br />(1,813) feet long to commence at
<br />Quartz Street and Madison Ave
<br />Q
<br />plans, profiles, detailed drawings
<br />or to the modified and!
<br />Chan ki
<br />ctfon of the southwest-
<br />theerl
<br />e bepro er d as shown on e I
<br />and pecifications reference Is
<br />said re�
<br />edments es at ware
<br />property line of Quartz Street
<br />¢taidd drawln
<br />P 1 drawings
<br />herebymade for a description of
<br />and Improvements to be donhich
<br />with the centerline of the ease- sand specifications to accommodate
<br />the grades at which said work is
<br />and made or to hwo
<br />assessed for oim-;
<br />ment through Block 8, New High
<br />box four ) foot b fiive (5) foot
<br />said k�andct
<br />to 'be done and improve-
<br />School Acres, and to run thence
<br />storm water
<br />said provements, may appear before+
<br />menta trade and the
<br />as shown on the plane across
<br />same, are said Council of the City of Red,
<br />before ordered, and that one (1) made a part hereof.
<br />Quartzwh
<br />five
<br />Streett to poinom
<br />t Iron pipe eight (8) Inches
<br />In All
<br />the hereinbefore and herein-
<br />and show cs
<br />et t north-
<br />diameter and twelve feet saiddproposed work andCity muse provZ1
<br />above mentioned and described ments be
<br />easterly line of Quartz Street;
<br />thence
<br />should not carried out tnl
<br />length be provided'and placed at work and improvements are to be accordance with Resolution bi
<br />the
<br />on a line distant five (5)
<br />feet southwesterly and parallel to
<br />said
<br />sewer crossing under said done and made at'the locations Intention No. M-12, or why said
<br />culvert on Madison Avenue, and
<br />and Positions and of the sizes and work and improvements should
<br />the northeasterly line of Quartz one (1) cast Iron six
<br />pipe ,(6) dimensions and of the materials as not be carried out and done at the
<br />Street to the northwest curb line inches in diameter and twelve (12) shown and described on the plans,
<br />modified, changed and established
<br />of Madison Avenue; thence on a feet' in length be provided and profiles, detailed - drawings
<br />curve across Madison Avenue to a placed at the sewer crossing under specifications
<br />and
<br />adopted•by the Coun-
<br />grades as shown on the plans, pro.
<br />point distant five (5) feet north- the to be built on, files and detailed drawings refer
<br />cll of the filty o1 Redwood
<br />^culvert ,Ruby
<br />City- red
<br />-to .herein, -T r ...,_
<br />t
<br />,
<br />
|