Laserfiche WebLink
*Resolution of Intention m-9* <br />Upon motion of Councilman McNulty, seconded by Councilman Beeger, affidavits of posting <br />and publishing Notice Inviting Sealed Proposals were ordered filed. <br />Upon opening bids, GT 0 Tysonts bid was $5,288.39 and W A Dontanvillets $4662.01, <br />whereupon Councilman Dusel, seconded by Councilman Hinman, offered the following <br />Resolution awarding the contract to ty A Dontanville and moved its adoption; <br />RESOLUTION OF LAFARD NO, hi -3. <br />WHEREAS, the Council of the City of Redwood City did, in open <br />session on the 11th day of August, 1930, publicly open, examine and <br />declare all sealed proposals or bids for doing the following work and <br />making the following improvements in said City of Redwood City, to -wit: <br />That Maple Street from the edge <br />of the existing Pavement and gut- <br />ter on the production in astralght <br />line of the westerly line of Alain. <br />Street northerly across said Maple <br />Street southwesterly to the pro- <br />duction of the division line be- <br />tween lots one (1) and two (2), <br />block six (6) Diller's Addition, as <br />shown on the map thereof record- <br />ed in Book R of Maps at page <br />77, records of San Mateo County, <br />extended southeasterly across said <br />Maple Street, be Improved as fol- <br />lows, to -wit: <br />1. That the existing concrete <br />curb on the northwesterly side of <br />Maple Street between the pro- <br />duction northerly of the westerly <br />line of Alain Street across Maple <br />Street southwesterly to the north- <br />erly line of the right of way of <br />the Southern Pacific Railroad <br />Company and thirty-seven (37) <br />linear feet of the existing concrete <br />tilrat the so <br />eb intersectionutof rlMainr Street <br />With Maple Street and also that <br />eighteen (18) linear feet of the <br />existing concrete Curb on Maple <br />Street at the southerly corner of <br />the termination of Lathrop Street <br />at Maple Street be removed, <br />2. That Maple Street for the full <br />Width of the roadway and for the <br />length hereinbefore described in <br />eluding all Intersections, termina• <br />tions, oppo.,ite terminations or poo <br />tions thereof within the lines and <br />limits of Maple Street above de- <br />scribed be graded and paved with <br />hydraulic cement concrete pave -j <br />ment six (6) Inches thick laid <br />upon a base of broken stone three, <br />(3) inches thick after rolling, with <br />a cushion of sand one (1) inch <br />thick laid between said broken <br />stone base and said concrete pave. <br />ment; provided, however, that said <br />concrete pavement shall have a <br />thickness of eight (8) Inches along <br />the centerline of said Maple Street <br />and taper to a thickness of six (6) <br />Inches at points three (3) feet on <br />each side of said centerline. <br />There is excepted from the <br />above described pavement all that <br />Portion of Maple Street lying be- <br />tween a line five (2) feet north- <br />easterly from and parallel to the <br />northeasterly rail of the Southern <br />Pacific Railroad Company's track:; <br />and a line two (2) feet south- <br />westerly from and parallel to the <br />most southwesterly rail of the <br />Southern Pacific Railroad Com- <br />pany's tracks; also there is ex- <br />cepted from the above described <br />Pavement the area included be- <br />tween the northeasterly and south- <br />westerly fines of the concrete <br />bridge on Maple Street between <br />the Southern Pacific Railroad <br />Company's right of way and Lath- <br />rop Street, <br />3• That hydraulic cement `con. <br />crete curbs integral with the pave. <br />ment and six (6),Inches across the <br />top and twelve (12) inches deep be <br />ners of intersections or termina- <br />constructed on both sides of Dia- <br />tions; said hydraulic cement con - <br />pie Street hereinbefore described <br />crete curbs to be laid upon a <br />Including all corners of Intersec- <br />base of broken stone three (3) <br />tions, terminations or opposite ter- <br />inches thick after rolling with <br />minations or portions thereof with- <br />a cushion of sand one (1) Inch <br />In the lines and limits of Maple <br />thick laid between the broken <br />Street as above described; said <br />stone hese and said concrete <br />hydraulic cement concrete curbs <br />curbs. <br />to be laid upon a base of broken <br />Reference Is hereby made to the <br />stone three (3) inches thick after <br />patent license agreement of Me - <br />rolling with it cushion of sand one <br />'Gverlast, Incorporated, dated the <br />(1) inch thick laid between said <br />12th day of October, 1028, and <br />broken stone base and said con- <br />now on file in the office of the <br />Crete curb to be built and con- <br />Cleric of the City of Redwood <br />structed at the same time as the <br />City, and the same is made a part <br />pavement. <br />hereof. <br />There is excepted from the <br />Reference Is hereby made to <br />above described hydraulic cement <br />the patent license agreement of <br />concrete curbs all curb now in <br />Concrete Curing Inc. dated the <br />place which has not been ordered <br />2nd day of December, 1920, and <br />removed herein and also there is <br />now on file in the office of the <br />excepted from the above described <br />Clerk of the City of Redwood City, <br />hydraulic cement concrete curb <br />and the same is made a part <br />the curb on both sides of Maple <br />hereof. <br />Street between the northeasterly <br />The width of the streets herein - <br />and southwesterly right of way <br />before mentioned, and the width <br />lines of the Southern Pacific Rail- <br />of the roadways of said streets, <br />road Company and there Is also <br />and the width of the sidewalks of <br />excepted from the above described <br />said streets are to be and are as <br />hydraulic cement concrete curbs <br />shown on the plans, profiles, and <br />the concrete bridge on Maple <br />detailed drawings hereinafter re - <br />Street between the Southern Pa- <br />ferred to herein. <br />cific Railroad Company's right of <br />That the official elevations for <br />-way and Lathrop Street, <br />the street grades of said streets <br />4. That hydraulic cement con- <br />hereinbefore mentioned, crown <br />crete sidewalks four (4) inches <br />grades, curb grades and grade <br />thick and five (5) feet in width be <br />elevations for top of gutters be <br />constructed on the northwesterly <br />changed and grades different <br />side of Maple Street between the <br />from those established or adopted <br />production In a straight line north- <br />prior to the adoption by the <br />westerly of the and of the c.,dst. <br />Council of the City of Redwood <br />Ing gutter on Main Street south- <br />City of the plans, profiles, detailed <br />westerly to the northeasterly right <br />drawings and specifications here- <br />of way line of the Southern Pa- <br />inafter referred to herein shall be <br />cific Railroad Company, and from <br />adopted, and such official and dif- <br />the southwesterly right of way <br />ferent and prior grades shall be <br />• line of the Southern Pacific Rail- <br />modified and are hereby modified <br />road Company to the existing side- <br />and changed so that the official <br />= walk at the northeasterly side of <br />grades shall be and conform to <br />i the concrete bridge on said Maple, <br />the grades as shown on the plans, <br />' Street between the Southern Pa- <br />profiles and detailed drawings for <br />CHIC Railroad Company's right <br />said work and Improvements, <br />1 of way line and Lathrop Street, <br />which plans, profiles and detailed <br />and from the southwesterly edge <br />drawings -were heretofore adopted <br />of the existing sidewalk at the <br />by the Council of the City of, <br />• southwesterly line of said bridge <br />Redwood City on the Seth day of <br />to the existing sidewalk at thr <br />June, 1930, by "Resolution Adopt- i <br />'production in a straight line of <br />Ing Plans, Profiles and Speeifica- <br />the division line between lots one <br />tions No. M-9;' which plans, ,pro - <br />(1) and two (2), block 6, Diller's <br />files, detailed drawings and specl- <br />Additionp hereinbefore referred to <br />ficatlons aro now on file in the <br />herein. <br />office of the Cleric of the City <br />5, That two '(2) hydraulic ce. <br />of Redwood City and to which <br />tnent Concrete storm water inlets <br />plans, profiles, detailed drawings <br />; with cast iron frames and Brat- <br />and specifications reference is, <br />Ings be constructed, one (1) on <br />hereby made for a description ofl <br />+each side of Maple Street at the <br />the glades at which said work laj <br />southerly end of the hydraulic ce- <br />to be done and said improvements] <br />aent concrete pavement herein or- <br />made and 'fie same are made it; <br />I., <br />tiered constructed on said Maple <br />part hereof. j <br />Street; said storm water inlets <br />All the hereinbefore and hereln- i <br />,T, <br />'y to be provided with a twelve (12) <br />above mentioned and described <br />finch concrete pipe drain forty- <br />work and improvements are to, <br />p eight (48) feet In length, connect. <br />be done and made at the locations <br />j Ing said inlets and to extend to <br />and positions and of the sizes and <br />y the creek. <br />dimensions and of the materiala asj <br />0. That the area of the concrete <br />shown and described on the plans, <br />• bridge on Maple Street, between <br />profiles, detailed drawings and <br />the Southern Pacific Railroad <br />specifications adopted by the <br />( Company's right of way and Loth. <br />Council of the City of Redwoori <br />e.rop Street and between the edges <br />City on the 16th day of June, 1030, <br />c of gutters on said bridge be paved <br />and now on fife in the office of <br />} with an asphaltic concrete pave- <br />the Clerk of said City, to which <br />i ment five (5) Inches thick at the <br />plans, profiles, detailed drawings <br />centerline of street, and tapering <br />and specifications reference is <br />E to a thickness of two (2) inches <br />hereby made for a complete de. <br />set edges of gutters. <br />scriptioD_A and location of said <br />That Maple Street in the City <br />v Improvements and for <br />Cswu^.n.. uu inaagiut 0,41; Nave -1 <br />' <br />merit six (8) 'inches adroes the' <br />top and twelve (12) inches deep <br />be constructed on both sides of the <br />hereinabove described portion of <br />Lathrop Street including all cor- <br />f <br />r <br />