My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
BOOK 18_1939-01-03 to 1942-08-10
RedwoodCity
>
City Clerk
>
Minutes
>
1939 to 1942 Book 18
>
BOOK 18_1939-01-03 to 1942-08-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2017 11:33:24 AM
Creation date
10/12/2017 11:13:17 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Minutes
Meeting Type
Regular
Agency Type
City Council
Date
1/3/1939
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
519
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
FL, <br />I <br />On motion of Councilman McCarthy, seconded by Councilman Anderson, <br />the Council concurred in the recommendation of acceptance made by <br />the City Manager. <br />On motion of Councilman Anderson, seconded by Councilman Jones, affi- <br />davits of the publication and the posting of notice.inviting <br />sealed proposals for the improvement of Nevada Street were ordered <br />filed. Following this, bids were publicly opened and declared <br />with the following results: <br />J. Ferioli & D. Bettini 07,272:41 <br />41. 0. Tyson 71293.73 <br />Piazza & Huntley 7,756.92 <br />Harvey E. Conner x,495.39 <br />L. C. Smith 7,491.69 <br />Detail of J. Ferioli & D. Bettini bid: <br />ITEM 1. For all Grading -Cutting, the sum of ($0.271) <br />Twenty-seven and one-half cents per cubic yard. <br />ITEM 2. For all Grading -Filling, the sum of Ten 00.10) <br />cents per cubic yard. <br />ITEM 3. For constructing complete cement concrete <br />combined curb and utter as specified, the <br />sum of Eighty-two 50.82) cents per lineal <br />foot of combined curb and ,gutter. <br />ITEM 4. For constructing complete the four (4) inch <br />stabilized slurry base pavement with an <br />asphaltic armor coat wearing surface as s eci- <br />fied, the sum of Eight and eight tenths (0.088) <br />cents per square foot of pavement. <br />ITEM 5• For constructing complete the three (3) rein- <br />forced concrete drop inlet catch basins with cast <br />iron frames and gratings, and the connecting one <br />hundred fifty-four (154) linear feet of twelve <br />(12) inch cement concrete storm water pipe drain <br />including excavation, the sum of Three Hundred <br />and 00/100 ($300.00) dollars for the complete <br />system. <br />Councilman McCarthy, seconded by Councilman Anderson, proposed adoption <br />of Resolution of Award No. 1939-4 by which the contract for this <br />improvement was awarded to J. Ferioli and D. Bettini. Carried. <br />Councilman McCarthy, seconded by Councilman Anderson, proposed adoption <br />of resolution protesting the deduction from the money allocated for <br />the rights -of -tray of El Camino Real. Carried. <br />The approved claims were ordered paid on motion of Councilman Anderson, <br />seconded by Councilman McCarthy. <br />Adjournment. <br />d , • 7K f eA <br />City Clerk <br />
The URL can be used to link to this page
Your browser does not support the video tag.