Laserfiche WebLink
254 for said'City, to wit: t <br />(a) By installing a 24 inch reinforced concrete pipe storm sewer complete <br />with manholes and all other structures appurtenant thereto, from an existing <br />catch an existing catch basin at the northeast intersection of Brewster Avenue <br />with Alameda de las Pulgas; thence along Alameda de las Pulgas to the inter- <br />section of Alameda de las Pulgas with Westgate; thence along Westgate to the <br />intersection of Westgate with Hopkins Avenue at the corporate limits line of <br />the City of Redwood City, California. By installing a 15inch reinforced con- <br />crete pipe storm sewer from a point at the termination of the aforementioned <br />24 inch sewer in a southeasterly direction parallel to said corporate limits <br />line, to a 5 foot easement in Lot 36, Block 15; thence along the said corporate <br />limits line in an easement 5 foot in width, contiguous to said corporate <br />limits line in said Lot 36, Block 152 as said lot is shown on that map entitled�)1! <br />"RESUBDIVISION OF BLOCK 15 IN OAK KNOLL MANOR, RECORDS OF SAN MATEO COUNTY," <br />to connect with a 2 foot by 2 foot concrete box to be installed and an exist- <br />ing 15 inch corrugated metal pipe culvert at said corporate limits line in <br />said Lot 36.,':Bl6ck'.15. <br />(b) By installing catch basins to be connected to the aforementioned <br />24 inch reinforced concrete pipe storm sewer at the following locations: - <br />(1) One catch basin at the intersection of Brewster Avenue with Alameda.i <br />de las Pulgas connected to said 24 inch storm sewer by an 18 inch reinforced <br />concrete pipe storm sewer lateral. <br />(2) Two catch basins at the intersection of Westgate with Alameda de las <br />pulgas connected to said 2k inch storm sewer by 15 inch reinforced concrete' <br />pipe storm sewer laterals. <br />(3) One catch basin at the intersection of Stanley Street with Westgate <br />connected to said 24 inch storm sewer by a 10 inch reinforced concrete pipe 4' <br />storm sewer lateral. <br />(4.) Two catch basins near the corporate limits line of Redwood City at <br />the intersection of Westgate with Hopkins Avenue, connected to said 24 inch <br />storm sewer by a 15 inch reinforced concrete pipe storm sewer lateral. <br />(c) The construction of an 18inch reinforced concrete pipe siphon with <br />a•catch basin at either end thereof across Stanley Street at Brewster Avenue. <br />(d) The improvement of Westgate by constructing therein concrete curb <br />and gutter, 4. inch concrete sidewalks, 5 feet wide, and 2 inch asphaltic <br />concrete paving with 6 inch crusher -run rock base, 31 feet in width, from the <br />intersection of Westgate with. Alameda de las Pulgas to the intersection of <br />Westgate with the existing paved surface on Hopkins Avenue. <br />(e) The improvement of Stanley Street by constructing therein concrete <br />curb and gutter, 4. inch concrete sidewalk, 5 feet wide, on the southerly <br />side thereof only, and 2 inch asphaltic concrete paving with 6 inch crusher <br />run rock base, 31 feet in width, from the intersection of Stanley Street <br />with Brewster Avenue to the intersection of Stanley Street with Westgate. <br />(f) The construction and installation of all necessary appurtenances <br />to the work to be done under items (a) through (e) inclusive. <br />All of said work and improvements are to be constructed at the places, in the <br />manner, of the sizes, of the materials, and to the lines, grades and elevations <br />as shown on the plans, profiles and specifications made therefor, and on file <br />in the office of the City Engineer of the City of Redwood City, and the same are made <br />a part hereof by reference thereto. <br />Whenever any public way is referred to as running between two public ways, or <br />from or to any public way, the intersections of the public ways referred to are <br />included to the extent that work shall be done therein pursuant to the plans and 4� <br />specifications hereinbefore referred to. <br />Said Council does hereby adopt and establish as the official grades for said <br />work the grades as shown on the plans, profiles and specifications made therefor I' <br />and hereinbefore referred to. _ <br />The total estimated cost of said improvements as determined -.by the City (i <br />Engineer of Redwood City, California, is the sum of $4.2,288.90. � <br />Said contemplated work and improvements, in the opinion of said City Council, <br />is of more than local or ordinary public benefit and said Council does hereby make <br />the cost and expenses of doing such work and improvements chargeable upon a dis- <br />trict, which district said Council declares to be the district benefited by said <br />work and improvements and to be assessed to pay the entire cost and expense there- <br />of, except that the City of Redwood City will pay the sum of $6,025.00 toward the <br />cost of said work and improvements, and which said district is wholly within the <br />limits of said City of Redwood City, State of California, and is described as <br />follows: <br />Said area being a portion of OAK KNOLL MANOR, San Mateo County, California, <br />recorded Iviay 10, 1916, in Vol 10 at•pages 4. to 11, inclusive, records of San Mateo <br />County, the bearings of which are the basis of this description. Said area includes <br />the Resubdivision of Block 15 in Oak Knoll Manor, recorded April 16, 1920 in Vol. <br />10 at page 31, San Mateo County records, and also a portion of Block 11, Oak <br />Knoll Manor, which area is more particularly described as follows: <br />.BEGINNING at the intersection of the Southwestern line of said Block 151 <br />Oak Knoll Manor with the Northwestern line of Brewster Avenue, said Southwestern <br />