Laserfiche WebLink
1 <br />AYES, and in favor of the passage and adoption of the foregoing resolution, 409 <br />Councilmen: BRITSCHGI, GRANGER, HOLMQUIST, MORGAN, SPILLERS, SWIFT, and Mayor WERDER. <br />NOES, Councilmen: NONE <br />ABSENT, Councilmen: NONE <br />ATTEST: <br />RALPH S. DODGE <br />Clerk of the City of Redwood City <br />I <br />W. M. WERDER <br />Mayor of the City of Redwood City <br />I hereby approve the foregoing resolution this <br />21st day of February, 1950. <br />W. Id. WERDER <br />Mayor of the City of Redwood City <br />REPORT ON BID OPENINGS, OPERATING CITY DM2 . City Manager Rolison stated'they.would.like <br />a little more time to determine ability and .equipment that would be used. Bid was <br />received of 075 from Romeo Joly. Councilman Spillers moved this be placed on agenda, <br />seconded by Councilman Morgan, and carried. <br />POSITION OF CIVIL ENGINEERING ASSISTANT. City Engineer Jain thought this had been taken <br />care of some time ago having been referred to the Personnel Board. Specifications for <br />,the job had been set up. Civil Engineering Aide had been set up instead of Civil <br />Engineering Assistant and there was considerable difference in the jobs and class- <br />ification. Councilman Granger moved that authority be granted to set up position for <br />Civil Engineering Assistant, seconded by Councilman Holmquist, and carried. <br />STREET IMPROVEMENTS, REESE STREET, JOHNSON STREET A11D OAK AVENUE. City Engineer Jain sub- <br />mitted petitions for the above improvements of Reese Street between Oak Avenue and <br />Redwood Avenue, Johnson Street between Oak Avenue and Redwood Avenue, and Oak Avenue <br />between King Street and approximately 76 feet NE -of Reese Street. Percentage frontage <br />petitioned 55.9E31'v and including City owned was 60.7%. As project would include two <br />large culvert structures, the estimated cost was approximately 016.00 per front foot. <br />It.was recommended that the City Engineer be authorized to prepare plans and specifi- <br />cations for the assessment project and the City Auditor be authorized to advance funds <br />for the work, cost'to be reimbursed from the assessment district. Several protested <br />the cost of the culverts which would amount to $4500 or 05000 in order to cover the <br />natural drainage channel for the City. Mrs. Petty Claire, Mr. Tipton, Reese Street <br />and Mr. Fred Alerdise protested the -entire assessment to this district although they <br />were willing to share. Councilman Holmquist stated there was a propossd bond of <br />0100,000 to be expended on creeks west of E1 Camino Real. Councilman-its,rhti sug- <br />gested that this be held over until after election. If the bond issue carried, the <br />money would be available. Councilman Britschgi moved that the City Engineer be <br />instructed to prepare plans and specifications as recommended, seconded by Councilman <br />Morgan, and carried. <br />STREET IMPROVEMENTS, DOUGLAS AVENUE BETWEEIT SPRING STREET AND IyIIDDLEFIELD ROAD. City <br />Engineer Jain reported that percentage of frontage petitioned was 60.4;Wo. All of the <br />south half of the street proposed to be improved lay in the County. The County Brig- <br />ineer had verbally advised that he preferred the City handle the entire proceedings <br />although it would require action by the Board of Supervisors to form a joint assess- <br />u <br />