My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
BOOK 26_1955-11-28 to 1957-06-17
RedwoodCity
>
City Clerk
>
Minutes
>
1955 to 1957 Book 26
>
BOOK 26_1955-11-28 to 1957-06-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2017 10:17:41 AM
Creation date
10/16/2017 10:00:08 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Minutes
Meeting Type
Regular
Agency Type
City Council
Date
11/28/1955
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
510
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
. 473 <br />Cbuncilman Stout moved to grant the Park Superintendent a step increase in salary (5th step) effective May 1, 1957, <br />seconded by Councilman Spillers and carried. <br />CITY ENGINEER REPORT ON YACHT HARBOR PILING AND RAMP. The City Engineer advised that the plans and specifications <br />have been completed by the Engineering Department for the following two construction projects: <br />1. Marine Harbor Piling only, without docks and finger piers. <br />2. Concrete Small -Boat Ramp at north end of Yacht Club building. <br />The Clerk read the report which reads'in part as follows: <br />[• The City Auditor advises that there is only the amount of $13,000.00 on hand in the Marine Harbor <br />Improvement Fund, and approximately $18,810.00 remaining in the Capital Project Fund. <br />We have been attempting to secure informal preliminary estimates from contractors interested in <br />Sri bidding on this work. Today we received the f ollowing estimates: <br />C(a) Marine Harobr Piling <br />depending on alternates accepted $6600. to $9200. <br />(b) Marine Harcbr Boat Ramp $9000. <br />The plans for piling were prepared in accordance with the preliminary layout submitted by Mr. Clive <br />A rmitage on behalf of the Marine Harobr Committee. Alternate proposals have been prepared for bidding as <br />follows: <br />1. Thirty -Seven (37) pilings suggested as minimum design by the Marine Harbor Committee, <br />and shown on Mr. Armitage's preliminary layout for development of the north portion of Marine Harbor <br />development only. <br />2. Thirty-five (35) pilings, shown as alternate proposal, reduced from above to compensate <br />for narrowing of channel due to sloughing of south levee into previously dredged area. <br />3. Fifty-four (54) pilings, shown as alternate proposal. This number was not deemed necessary <br />by Mr. Armitage, and not shown on his pr6liminary layout, but was added to this proposal because 'of <br />the question by certain Yacht Club mebers as to the adequacy of the approved preliminary layout, for <br />proper support of future floats and finger piers against wind loads. <br />As to the boat ramp, thought was originally given to a more temporary and less costly type of <br />construction than concrete: Hmvever, we understood that the concrete permanent type of ramp was <br />desired, so plans were prepared accordingly. <br />It is apparent that the remaining funds now allocated to the Marine Harbor Fund are not <br />sufficient for both the piling and ramp projects. Your attention is again called to the fact that <br />installation of the pilings, as now pl.anneds will not provide dockage for Marine Harbor boats, <br />as floats and finger piers must be constructed as an additional project, at a cost of probably <br />forty of fifty thousand dollars. Preliminary design only has been made for the header floats and <br />finger floats. When sufficient funds are made available for construction of these floats, plans <br />and specifications will be prepared. <br />In view of the above facts, the Council and Marine Harbor Committee may wish to further discuss the <br />plans and methods of financing before proceeding with advertisement for bids <br />Very truly yours, <br />Glenn M. Jain, City Engineer <br />Councilman Herkner recommended that this matter be referred to the Yacht Harbor Cammittee, Councilman <br />Herkner moved that the report be accepted and be referred to the Yacht Harbor Committee, seconded by Council- <br />man Spillers. This was followed by discussion in regard to the questions raised by Councilman Stout in <br />regard to the location of the ramp. Councilman Weiss asked if they had an over all plan of the area. Coun- <br />cilman Herkner stated that they had plans and also specifications. They are going to eliminate three piles. <br />The plans are complete and the Yacht Harbor Committee feels they are adequate. This was folloved by <br />discussion after which the motion carried. <br />FARM HILLS BOULEVARD ASSESSMENT DISTRICT. Councilman Spillers offered RESOLUTION 2239 STATING THE INTENTION OF THE <br />CITY OF REDWOOD CITY IN RELATION TO THE IMPROVEMENT OF FARM HILL BOULEVARD BETWEEN THE NORTHERLY TERMINUS OF <br />FARM HILL BOULEVARD AS SHOWN ON THE MAP OF FARM HILL SUBDIVISION NO. 1 TO CONNECT WITH JEFFERSON AVENUE AS <br />IT PRESENTLY EXISTS IN THE CITY OF REDWOOD CITY and moved its adoption, seconded by Councilman Weymouth. <br />Councilman Weiss raised the question as to the extent of the area that could be included in the special <br />assessment district under the 1911 Bond Act. He referred to the elimination of Mr. Davis's property. This <br />was answered by the City'Attorney who stated that they have not approved the assessment district and to re- <br />mind the council that they obtained an outside attorney to handle assessment matters. The motion carried on <br />
The URL can be used to link to this page
Your browser does not support the video tag.