Laserfiche WebLink
W• <br />oilman Weiss read the -following prepared statement: <br />; <br />"In connection with this report I can only say that the report as submitted does not <br />(, <br />conform with the motion as passed, in that it covers only the questions I raised <br />and wished included in the overall survey. I must also remark that responses even to <br />said questions are not in sufficient detail to convey specific or detailed infor- <br />mation. The report does not in any way cover the requirement or request that a com- <br />prehensive survey and report be made together with pertinent comments and recommen- <br />dations the City Manager deems appropriate. <br />Under the circumstances and since the motion granted time until the first meeting in <br />August, I request, and if necessary so moved, that this matter be carried on the <br />agenda for our meeting of August 5th. In the interim, with Council permission, I <br />should like to confer with the City Manager so that there may be a clearer understand- <br />R <br />ing as to the details and information desired in said report." <br />The Mayor stated that he could not see any objections to Councilman Weiss contacting <br />the City Manager for further information. <br />Councilman Granger moved that the City Manager be authorized to pay the bill in the <br />amount of $32.21 for the crane operation at the launching of boats :at the Regatta, <br />seconded by Councilman Stout and carried. <br />CITY ENGINEER REPORT ON BID OPENINGS, SEQUOIA RESERVOIR AND SUPPLY MAINS AND DRAIN LINES. <br />The Clerk read the following letter from the City Engineer: <br />RESERVOIRS: <br />Elmer J. Freethy, El Cerrito <br />Oscar C. Holmes, Inc., R. C. <br />S a Q Construction Company, <br />South San Francisco <br />Walter Lenkeit, 'San Francisco <br />E. T. Haas Company, Belmont <br />ALTERNATE I <br />(Wire Horizontally - <br />Cables Vertically) <br />0479019.20 <br />505,212.00 <br />511,761.60 <br />519,869.00 <br />526,383.00 <br />ALTERNATE II <br />(Cables Horizontally <br />and Vertically) <br />$477,458.20 <br />No Bid <br />505,272.10 <br />499,924.00 <br />No Bid <br />Consulting Engineer's Estimate $415080.50 $417,355.50 <br />(Larence G. Brian) 5/24/57 1. <br />SUMMARY OF LOW BIDS: ALTERNATE I ALTERNATE II <br />Two 4 million gallon reservoirs $479019.20 $477,458.20 <br />Supply mains & drain line 599826.50 59,826-50 <br />Totals 0539,145.70 $537,284.70 <br />The bond issue passed in April 1956 in the amount of $500,000 was based on a pre- <br />liminary estimate in the amount of $367,054 for contract item only, prepared by <br />Mr. Lawrance G. Brian under date of January 3, 1956. The consulting engineer's later <br />estimate, dated May 24, 1957, were prepared after plans and specifications were com- <br />pleted, and totaled $471,160.50 for Alternate I with the supply mains and drain line, <br />and $473,135.50 for Alternate II with the supply mains and drain line. <br />Based upon the above low bids for prestressed concrete reservoirs, it is apparent <br />that the total cost of the combined projects will probably be at least $600,000 1� <br />including land acquisition, consulting engineer's fees, foundation investigation, <br />inspection and construction engineering. If the concrete reservoirs are constructed, <br />it is apparant that at least $100,000 additional must be provided either from an <br />additional bond issue, or from accumultLted Water Department funds, or the project <br />must be reduced in scope by eliminating sufficient items to allow construction 3 <br />within t1e $500,000 bond issue. It might be possible to negotiate with the low �s <br />bidders to eliminate certain items from their bids. Additional time will be <br />necessary to further analyze the bids, negotiate with the contractors and determine <br />which items might be eliminated and still construct an operatable reservoir system. <br />The only alternative would be to reject all bids and have the consulting engineer <br />re -design the project to come within the available funds. <br />