34 <br />Some of the Council members may recall that the present water rates for the Emerald <br />Lake district were establishedon May 1, 1950 following a comprehensive study which, <br />among other things, revealed that th the past "substantial annual losses to the City <br />in the operation of the Emerald Lake water system had been the rule rather than the <br />exception". Also that, "it was imperative for the protection of existing consumers <br />in the entire area, that at least the 3ftein supply lines and storage facilities be <br />maintained in a manner that will insure a continuous source sufficient to supply <br />numerous storage tanks located at various distributioh levels". At this time it was <br />emphasized also that "current revenues, even with this proposedincrease, will not <br />provide sufficient funds for the improvement of distribution facilities affecting �{ <br />individual consumers, due to the fact that necessary replacements and improvements to 1' <br />supply lines and storage facilities must be given first priority". <br />OPERATING REVENUE AND EXPENSE: j <br />The following table summarizes the revenues and expenditures applicable to the above <br />area for the past five years, during which time a careful segregation of funds has <br />been included in the Uhlenberg annual audit of the Redwood City Water Department. <br />REVENUE AND EXPENSE 1� <br />Emerald Lake Area j <br />Total Total Net Investment Unappropriated <br />Operating Operating Annual Fixed Surplus <br />Date Revenue Expense Income Capital June 30 <br />From Uhlenberg Report for 7/1/51 $20,800.25 <br />1952 $$64,700.81 050,93.8.92 $$13,761.29 $G25,470.56 $ 9,090.98 <br />1953 64,304.60 523639.16 11,665.44 222646.12 1,889.70 <br />1954 64,436.70 58,448.98 5,987.72 4,824.45 726.43 <br />1955 64,099.22 52,974.01 110125.21 27.05 10,425.83 <br />1956 64,478.53 529476.96 12,001.57 6,119.08 16,308.32 <br />DISPOSITION OF ACCUMULATED SURPLUS <br />In keeping with the above, policy, all net earnings for theyears 1949-50-512 amounting <br />to the sum of $$282412.79, were spent for the improvement of pumping supply lines and <br />storage facilities as a general benefit to the entire Emerald Lake area. <br />Also, substantial investments have been made in "Fixed Capital" as shown in the , <br />Uhlenberg reports of 1952 through 1956, as shown in the above table. However, it is <br />quite true that the accumulated surplus as of June 30, 1956, in the amount of $16,308.52, <br />has not as yet been appropriated for any specific improvements. This, as explained <br />by the Water Superintendent, has been held pending the outcome of annexation activities. <br />FUTURE WORK PROGRAM <br />It is clear from the above table that present water rates do not <br />return sufficient <br />revenue to finance a large scale improvement in this area, which <br />in the Adamson report <br />was estimated in excess of $$2,000,000. However, in the interest <br />of maintenance and <br />service requirements of the existing supply and storage system, the following improve- <br />ments are recommended by the Water Superintendent, to be financed <br />as surplus funds <br />become available. <br />Estimated <br />PROJEC.T <br />Cost <br />e 1. At the Vista and Oak Pumping site, replace one of the <br />two old 28,000 gallon redwood tanks, renew roof of the <br />other, and replace the existing old 25 hp pump and <br />motor with a new 25 hp unit <br />50000.00 <br />2. Abandon the old 4" steel line running from lower <br />Emerald Lake at Lake Blvd. and Park Road, across <br />private property to Summit Drive, and install <br />approximately 1200 feet of new 6" line to replace <br />the old man . <br />t <br />90000.00 <br />r, <br />3. At the Easter Cross storage tank, remove the old <br />28,000 gallon wooden tank, and replace with a new <br />28,000 gallon wooden tank, with necessary valves and <br />" <br />connections . . . . . . . . . . . . . . . . . . . . . <br />. . $$ 4,000.00 <br />4. At the Million Gallon Reservoir, install a larger <br />pumping unit with pump house, pump control valves, <br />recording meter, and a new discharge line . <br />7,500.00 <br />5. A new 611 inlet and outlet line from the Welbanks <br />wooden storage tanks should be installed in a new <br />location . . . . . . . . .. <br />$$ 8,000.00 <br />Total Estimated Cost of Improvements . . . . <br />$$ 33,500.00 j <br />The Water Superintendent emphasizes the fact that these proposals <br />are for the purpose <br />of correcting immediate deficiencies but are not adequate to meet <br />the ultimate need ' <br />of a large scale development program, as proposed by Mr. Paul Adamson <br />in his survey <br />of the Emerald Lake Area. <br />As I have stated in my previous reports on the Emerald LLa}e yajer <br />problems, such <br />major improvements can only be accomplished by some metho 0 ong <br />term financing, <br />ri <br />