My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt99 W L Butler Construction
RedwoodCity
>
City Clerk
>
Agreements
>
1990-1999
>
1999
>
Agmt99 W L Butler Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2005 2:53:02 PM
Creation date
5/13/2002 9:40:26 AM
Metadata
Fields
Template:
Agreement
Contractor Name
W L Butler Construction
PROJECT NAME
design & construction Fire Station 11
RMP File Number
304
Date
4/23/1999
Reso Ref
13602 13783 13818
MO Ref
01-28 01-50
Box
5900
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
conditions, and specifications pertaining thereto (the "Contract Documents"), which documents <br />are incorporated herein by this reference as if fully set forth herein. <br /> <br /> All drawings and specifications shall be prepared under the responsible charge <br />of an architect, and engineer, or structural engineer, as specified in writing by the City, in privity <br />of contract with the DB and by the City Engineer or its designee, who shall sign all drawings and <br />specifications for approval of the City. Observation of the work of construction shall be under <br />the general responsibility charge of the same architect, and engineer, or structural engineer <br />when feasible, as determined by the City, and of the City Engineer, or its designee. <br /> <br /> 2. WORK PERFORMANCE; RESPONSIBILITIES. (a) Work Performance: All of <br />the work to be done on the Project (the "Work") shall be done under the direction and <br />supervision of, and with and to the approval of, City or its authorized representative, and DB <br />shall cause the work to be done in a workmanlike manner, conforming strictly to the provisions <br />of the specifications and plans made therefor and within the time agreed upon by the parties. <br /> <br /> (b) Resconsibilities: DB shall be responsible to City for the act and omissions of DB's <br />agents, suppliers, employees, and Subcontractors, their respective agents and employees, and <br />those in privity with DB, for work performed under this Agreement. In addition to the <br />responsibilities set forth elsewhere in the Contract Documents, DB shall have the responsibility <br />for the following: <br /> <br /> 2(b)1. Site Conditions <br /> <br /> (a) Prior to Execution of this Aqreement: The DB will be held to have carefully <br />examined the Site and all Site conditions prior to execution of this Agreement. <br /> <br /> (b) Prior to Solicitation of Subcontractors' Bids: A. Prior to soliciting <br />subcontractor bids, the DB will be held to have carefully examined all of the Site Conditions, as <br />well as all parts of the existing buildings, grounds, and approaches thereto, including, but not <br /> <br />Agmt-247 <br />F/sh/sh/RC/Council <br /> <br />FXS:rg <br />03/29/99R;04/05/99R, 04/07/99R <br /> '2- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.